Carefully observe the following instructions: 

 

 

Installation and maintenance must be carried out by a competent person, in compliance with the 

manufacturer's instructions, the relevant wiring regulations and local safety regulations. 

If in any doubt, consult a qualified electrician

 

The device must be disconnected from the power supply before carrying out any installation or 

service work. 

 

Do not remove the device cover while the power supply is connected. 

 

Do not operate the device with the cover removed. 

 

Do not attempt to repair or replace any part of the device. In case of malfunction contact your 

installer or CityEV Ltd. 

 

All maintenance operations must be carried out by a qualified technician. 

 

The manufacturer accepts no responsibility for any damage or injury caused by improper use or failure 

to comply with these instructions. 

 

Failure to follow these instructions can result in death or serious injury. 

Important Safety Information 

 

                         

Содержание Safevolt 50

Страница 1: ...Documentation Revision 1 31 September 2020 Copyright 2020 CityEV Limited All Rights Reserved All trademarks are owned by CityEV Limited CityEV Safevolt 50 User and Installation Manual...

Страница 2: ...fety Information 3 The CityEV Safevolt 50 5 Safevolt 50 Operation 5 Positioning 7 Removing the cover 7 Connections 8 Electrical Testing 9 Precautions 9 General 9 10 Using SWA cables with Safevolt 50 1...

Страница 3: ...ED WITH THE ENGLISH LANGUAGE VERSION WHICH IS POSTED AT WWW CITYEV NET Revision 1 31 Date September 2020 Product Part Number Safevolt 50 About Your System As soon as you open your product record the f...

Страница 4: ...tion or service work Do not remove the device cover while the power supply is connected Do not operate the device with the cover removed Do not attempt to repair or replace any part of the device In c...

Страница 5: ...le Charging Equipment There is no need to convert to TT or install an isolation transformer Safevolt 50 Operation The Safevolt 50 status indicators are shown and described below During normal operatio...

Страница 6: ...50 unit is not weather protected and intended for indoor installation only Figure 2 below shows typical single phase charge point installation using the Safevolt 50 protection unit Safevolt 50 single...

Страница 7: ...sed e g flat T E round or SWA types Ensure cables are securely secured by glands or use cable ties if necessary Electrically the unit is connected in series with the charge point supply Removing the c...

Страница 8: ...CPC is connected to the left hand lever connectors and the outgoing supply to the charge point is connected to the right hand lever connectors as shown Note Maximum cable size is 6mm2 CityEV Safevolt...

Страница 9: ...the charge point disconnected also Precautions General The Safevolt 50 unit is designed to isolate the installation PME earth from the charge point CPC in the event of a PEN conductor PME failure It i...

Страница 10: ...oint CPC including the metal case of the Safevolt unit For instance an SWA cable terminated in the charge point case and a building DB with a metallic case will cause such a connection and is not allo...

Страница 11: ...onds Earth Fault Trip Reset Automatic Connectors Screw Terminal Max 6mm2 Indicators Output On PME Earth Fault Dimensions Wall mounting 200mm W x 70mm H x 50mm D Weight 750g Environmental Operating Tem...

Страница 12: ...1 iv 2018 Electric vehicle charging installations TN systems I hereby declare that the equipment named above is compliant with the relevant sections of the above referenced specifications The unit co...

Отзывы: