Scenario 3
Scenario 4
CEILING
CEILING
A
A
C
E
B
A
A
C
E
D
B
3 Installation schematic
6
0118 969 1611 | [email protected] | www.cistermiser.co.uk
Max 10 metre cable length between sensor (A) and furthest valve
Max 30 metres cable length between SZ/IF (B) and furthest valve
Max 10 metre cable length between sensor (A) and furthest valve
Max 30 metres cable length between SZ/IF (B) and furthest valve
Max 100 metre cable length between SZ/IF (B) and SZ/LFC (D)
Sensor(s) installation: Refer to page 7 for details
SZ/IF installation: Refer to page 7 for details
SZ/LFC installation: Refer to page 8 for details
Valve installation: Refer to page 8 for details
Mains power adapter: Refer to page 9 for details
A
B
D
C
E
Cold water supply
to washr
oom
Cold water supply
to washr
oom
Isolating Valve
(not supplied)
Isolating Valve
(not supplied)
Hot water supply to
washr
oom
Hot water supply to
washr
oom
Gr
ey or rainwater
supply to washr
oom
Gr
ey or rainwater
supply to washr
oom
Detection Zone: 5 metres
Detection Zone: 5 metres
2.2 metr
es
2.2 metr
es
Max 1.85 metres cable length
Max 1.85 metres cable length