Page 27
S6162-BS-MMC-010/12489
Small Gear Reducer Operation and Maintenace
BEFORE PLACING THE DRYER IN OPERATION, Remove small screw from vent tube in top
rear of each Gear Reducer
case. Remove
the cork from the oil level inspection
cup. If the oil
level
is
correct,
the
oil
level
inspection
cup
will
be
half
filled
with
oil.
If
not,
add
oil.
Oil
may
be added to the Gear Reducer by removing the filler plug in the top rear of the Gear Reducer
case. Do not operate a Gear Reducer unless the drain plug is tight, and the vent tube screw
removed.
If
it
is
necessary
to
return
a
Gear
Reducer
to
the
factory,
either
replace
the
small
screw
in
the
vent
tube
and
plug
the
oil-level
inspection
cup
with
a
cork,
or
drain
all
oil
from
the
reducer
by
removing the drain plug located in the bottom rear of the Gear Reducer case.
EACH GEAR REDUCER is filled with 5 pints of Cissell TU3465 transmission oil before leav-
ing the factory. Change oil once every 6 months.
THE LARGE TIMKEN BEARINGS, which support the worm gear and basket load, must
operate in a preloaded condition, that is the worm gear must not have end play. The Gear
Reducer
is
assembled
at
the
factory
to
provide
a
16-20
inch
lb.
pre-load
on
these
bearings.
THE SMALL TIMKEN BEARINGS, which carry the worm must operate in a pre-loaded
condition, that is, the worm must not have end play. The Gear Reducer is assembled at the
factory
to
provide
a
2-4
inch
lb.
pre-load
on
these
bearings.
Содержание L36TD30ME
Страница 10: ...Page 10 S6162 BS MMC 010 12489...
Страница 20: ...Page 20 S6162 BS MMC 010 12489 RECOMMENDED STEAM PIPING INSTALLATION ILLUSTRATION...
Страница 40: ...Page 40 S6162 BS MMC 010 12489 BACK CHANNEL BOLTED ASSEMBLY TU10600...
Страница 50: ...Page 50 S6162 BS MMC 010 12489...
Страница 51: ...Page 51 S6162 BS MMC 010 12489...
Страница 52: ...Page 52 S6162 BS MMC 010 12489...
Страница 53: ...Page 53 S6162 BS MMC 010 12489...