Page 21
Steam Dryers - Option Installation Instructions (When The Steam Bonnet Is Shipped Separate)
1. The dryer comes in two wood crates:
A - Very large crate
B - Smaller crate
2. Open Crate A and lift dryer off the skid and set in place.
3. Open Crate B. It contains two assemblies:
I - Control Box Assembly
II - Steam Bonnet Assembly
4. Place II - Steam Bonnet Assembly on top of the dryer and
slide piped end to rear of dryer. Bolt to top with six
3/8” ( 10 mm) bolts, flat washers and lockwashers provided.
Attach Solenoid Conduits (2) to the Right Front Control
Box. Then connect the wires as per diagram on the rear
wall of dryer.
5. Place I - Control Box Assembly on top front of the dryer and
bolt in place with six 3/8” (10 mm) bolts, flat washers and
lockwashers. Snap the electrical connections together.
6. Proceed with steam piping, electrical services and duct
work, as specified in technical manual.
STEAM DRYERS -OPTION
INSTALLATION
INSTRUCTIONS
Содержание HD170
Страница 12: ...Page 12 GAS DRYER DIMENSIONS ...
Страница 13: ...Page 13 STEAM DRYER DIMENSIONS ...
Страница 18: ...Page 18 GAS PIPING INSTALLATION ILLUSTRATION ...
Страница 26: ...Page 26 DRYER INSTALLATION WITH MULTIPLE EXHAUST ILLUSTRATION ...
Страница 33: ...Page 33 OPERATING INSTRUCTIONS TWO TIMER MODELS ...
Страница 41: ...Page 41 DIRECT SPARK IGNITION OPERATION FLOW CHART ...
Страница 43: ...Page 43 BURNER AIR INLET ADJUSTMENT BURNER AIR INLET ADJUSTMENT ...
Страница 44: ...Page 44 BASKET ALIGNMENT FOR DRYERS WITH TM200 GEAR REDUCER ...
Страница 53: ...Page 53 REAR VIEW TM200 GEAR REDUCER See following page for partnumbers ToGearM otor ...
Страница 55: ...Page 55 REAR VIEW GEAR MOTOR See following page for partnumbers ToGearM otor ToFanM otor ...
Страница 75: ...Page 75 ...