D-20
Cisco UCS C240 M4 Server Installation and Service Guide
OL-32474-01
Appendix D GPU Card Installation
Figure D-10
Air Baffle Filler Panel and Bridge
Step 19
Install the bridge to the air baffle. Ridges on the bridge legs slide into slots on the air baffle base (see
Step 20
If the server has a SuperCap power module (RAID battery unit), install it to the holding clip on the new
air baffle (see
).
a.
Set the module into the clips and gently press down until the clip closes over the module.
b.
Route the module’s cable through the opening in the air baffle (see
interfere with the server top cover.
Step 21
Replace the top cover to the server.
Step 22
Replace the server in the rack, replace cables, and then power on the server by pressing the Power button.
Step 23
Continue with
Installing Drivers to Support the NVIDIA GPU Cards, page D-31
.
1
Air baffle base
4
Holding clip for SuperCap module (RAID battery)
2
Filler panel
5
Path for SuperCap module cable through air baffle
opening (SuperCap module not shown)
3
Bridge
305093
2
1
3
4
5
Содержание UCS C240 M4
Страница 8: ...Contents viii Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Страница 12: ...xii Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Страница 14: ...xiv Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Страница 16: ...xvi Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Страница 26: ...1 10 Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 Chapter 1 Overview ...