D-8
Cisco UCS C240 M4 Server Installation and Service Guide
OL-32474-01
Appendix D GPU Card Installation
Step 11
Install the low-profile replacement heatsinks that come with the conversion kit:
a.
Remove the protective tape from the pre-applied pad of thermal grease that is on the underside of
the new heatsink.
b.
Align the four heatsink captive screws with the motherboard standoffs, and then use a Number 2
Phillips-head screwdriver to tighten the captive screws evenly.
Note
Alternate tightening each screw evenly to avoid damaging the heatsink or CPU.
Step 12
Set the base of the replacement air baffle into the server (see
Figure D-2
Air Baffle Base
1
Fan cage
4
GPU front support bracket latches
2
Air baffle base
5
PCIe risers
3
Holder for RAID battery on air baffle
305092
1
3
4
5
2
Содержание UCS C240 M4
Страница 8: ...Contents viii Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Страница 12: ...xii Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Страница 14: ...xiv Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Страница 16: ...xvi Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Страница 26: ...1 10 Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 Chapter 1 Overview ...