![Cisco UCS 5108 Скачать руководство пользователя страница 110](http://html.mh-extra.com/html/cisco/ucs-5108/ucs-5108_installation-manual_63845110.webp)
Date
Time
Verified By
Planning Activity
Task No.
Environmental evaluation:
•
Ambient temperature
•
Humidity
•
Altitude
•
Atmospheric contamination
•
Air flow
2
Power evaluation:
•
Input power type
•
Power receptacles
•
Receptacle proximity to the
equipment
•
Dedicated circuit for power supply
•
Dedicated (separate) circuits for
redundant power supplies
•
UPS
for power failures
3
Grounding evaluation:
•
Circuit breaker size
•
CO ground (AC- powered systems)
4
Cable and interface equipment evaluation:
•
Cable type
•
Connector type
•
Cable distance limitations
•
Interface equipment (transceivers)
5
EMI
evaluation:
•
Distance limitations for signaling
•
Site wiring
•
RFI
levels
6
6 Verify that the power supply installed in the chassis has a dedicated AC source circuit.
7 UPS: uninterruptable power supply.
Cisco UCS 5108 Server Chassis Installation Guide
98
Site Planning and Maintenance Records
Site Preparation Checklist