2-11
Cisco SN 5428-2 Storage Router Hardware Installation Guide
OL-4797-01
Chapter 2 Installing the SN 5428-2 Storage Router
Installing the SN 5428-2 Chassis
Step 6
Align the holes in the rails with mounting holes in the rack. Ensure that the rails
are level from front to rear and side to side. (See
Figure 2-6
.)
Step 7
Attach the front of each rail by screwing one screw through the front top hole of
the rail into a corresponding hole in the mounting post. (See
Figure 2-6
.) Attach
the rear of each rail by screwing two screws through the rear holes of the rail into
the corresponding holes in the mounting post.
Figure 2-6
Attaching the Rails to the Rack
85413