1-19
Cisco ONS 15454 DWDM Procedure Guide, Release 9.2
78-19286-01
Chapter 1 Install the Cisco ONS 15454 Shelf Assembly
Required Tools and Equipment (ETSI)
Figure 1-5
Mounting the Air Ramp in a Rack
Step 4
Repeat this task for every shelf assembly you need to install.
Step 5
Return to your originating procedure (NTP).
DLP-G8 Install the Air Ramp
Step 1
The air ramp requires 50 mm of space in a standard 19-inch (482.6-mm) or 23-inch (584.2-mm) rack.
Locate the rack mount unit (RMU) space specified in your site plan. Refer to the “Shelf Assembly
Hardware” chapter in the Cisco ONS 15454 DWDM Reference Manual for more information about air
ramp placement.
Step 2
Verify the rack type of your air ramp installation. The brackets are compatible with the following racks.
•
19-inch racks as defined in IEC 297-1(2 Nos.)
•
19-inch for deep door configuration (2 Nos.)
Purpose
Use this task to install the air ramp for standard and deep door ONS 15454
Tools/Equipment
#2 Phillips Dynamometric screwdriver
Prerequisite Procedures None
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
None
61582
Equipment rack
Содержание ONS 15454
Страница 48: ...Tables xlviii Cisco ONS 15454 DWDM Procedure Guide Release 9 2 78 19286 01 ...
Страница 58: ...Procedures lviii Cisco ONS 15454 DWDM Procedure Guide Release 9 2 78 19286 01 ...
Страница 78: ...Tasks lxxviii Cisco ONS 15454 DWDM Procedure Guide Release 9 2 78 19286 01 ...
Страница 85: ...lxxxv Cisco ONS 15454 DWDM Procedure Guide Release 9 2 78 19286 01 Preface ...
Страница 87: ...lxxxvii Cisco ONS 15454 DWDM Procedure Guide Release 9 2 78 19286 01 Preface ...