1-30
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 1 Install the Shelf and Backplane Cable
NTP-A13 Perform the Shelf Installation Acceptance Test
NTP-A13 Perform the Shelf Installation Acceptance Test
Warning
The covers are an integral part of the safety design of the product. Do not operate the unit without the
covers installed.
Step 1
Complete
by verifying that each applicable procedure was completed.
Step 2
Complete the
“DLP-A32 Inspect the Shelf Installation and Connections” task on page 17-39
Step 3
Complete the
“DLP-A33 Measure Voltage” task on page 17-39
.
Step 4
Continue with
Chapter 2, “Install Cards and Fiber-Optic Cable.”
Stop. You have completed this procedure.
Purpose
Use this procedure to perform a shelf installation acceptance test.
Tools/Equipment
Voltmeter
Prerequisite Procedures
Applicable procedures in Chapter 1
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
None
Table 1-5
Shelf Installation Task Summary
Description
Completed
NTP-A1 Unpack and Inspect the ONS 15454 Shelf Assembly, page 1-4
NTP-A2 Install the Shelf Assembly, page 1-5
NTP-A3 Open and Remove the Front Door, page 1-6
NTP-A4 Remove the Backplane Covers, page 1-7
NTP-A5 Install the EIAs, page 1-7
NTP-A6 Install the Power and Ground, page 1-9
NTP-A7 Install the Fan-Tray Assembly, page 1-10
NTP-A119 Install the Alarm Expansion Panel, page 1-12
NTP-A8 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections, page 1-15
NTP-A120 Install an External Wire-Wrap Panel to the AEP, page 1-16
NTP-A9 Install the Electrical Card Cables on the Backplane, page 1-21
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...