Contents
vii
Cisco ONS 15327 User Documentation
June 2002
3.8 Viewing CTC Software Versions
3-17
4-19
4-19
4.2 ONS 15327 IP Addressing Scenarios
4-20
Scenario 1: CTC and ONS 15327s on Same Subnet
4-21
Scenario 2: CTC and ONS 15327s Connected to Router
4-22
Scenario 3: Using Proxy ARP to Enable an ONS 15327 Gateway
4-23
4.2.4 Scenario 4: Default Gateway on CTC Computer
4-24
Scenario 5: Using Static Routes to Connect to LANs
4-25
Scenario 6: Using OSPF
4-27
4-30
4.2.7 Scenario 7: Provisioning the ONS 15327 Proxy Server
4-32
4-38
5-1
5.2 Bidirectional Line Switched Rings
5-1
5-2
5-4
5-5
5-7
5-7
Create the BLSR DCC Terminations
5-8
5-8
5-9
5.2.5 Adding and Removing BLSR Nodes
5-11
5-12
5-15
5-16
5-18
5.3 Unidirectional Path Switched Rings
5-20
5.3.1 Example UPSR Application
5-22
5-23
5-23
Configure the UPSR DCC Terminations
5-24
5-25
5.3.3 Adding and Removing UPSR Nodes
5-25
5-25
Содержание ONS 15327
Страница 22: ...Contents xxii Cisco ONS 15327 User Documentation June 2002 I N D E X ...
Страница 30: ...Figures xxviii Cisco ONS 15327 User Documentation June 2002 ...
Страница 44: ...Procedures xlii Cisco ONS 15454 Installation and Operations Guide R3 2 June 2002 ...
Страница 82: ...1 32 Cisco ONS 15327 User Documentation R3 3 June 2002 Chapter 1 Hardware Installation Hardware Specifications ...
Страница 166: ...4 22 Cisco ONS 15327 User Documentation R3 3 June 2002 Chapter 4 IP Networking ONS 15327 Routing Table ...
Страница 254: ...7 22 Cisco ONS 15327 User Documentation R3 3 June 2002 Chapter 7 Card Provisioning Using Virtual Wires ...
Страница 408: ...13 26 Cisco ONS 15327 User Documentation R3 3 June 2002 Chapter 13 Card Reference E10 100 4 Card ...
Страница 540: ...Glossary GL 16 Cisco ONS 15327 User Documentation R3 3 June 2002 ...