Mounting rails on rack or cabinet posts.
3
Fasten the chassis to the front of the rack with two
12-24 or 10-32 screws on each side.
1
Front-mount bracket.
2
d) Tighten the 10-32 screws to 20 in-lb (2.26 N·m) or tighten the 12-24 screws to 30 in-lb (3.39 N·m).
Step 6
If you attached a grounding wire to the chassis grounding pad, connect the other end of the wire to the facility ground.
Grounding the Chassis
The switch chassis is automatically grounded when you properly install the switch in a grounded rack with
metal-to-metal connections between the switch and rack.
You can alternatively ground the chassis (this is required if the rack is not grounded) by attaching a
customer-supplied grounding cable to the chassis grounding pad and the facility ground.
Cisco Nexus 93108TC-FX ACI Mode Hardware Installation Guide
20
Installing the Switch Chassis
Grounding the Chassis
Содержание Nexus 93108TC-FX
Страница 6: ...Cisco Nexus 93108TC FX ACI Mode Hardware Installation Guide vi Contents ...
Страница 14: ...Cisco Nexus 93108TC FX ACI Mode Hardware Installation Guide 4 Overview Overview ...
Страница 22: ...Cisco Nexus 93108TC FX ACI Mode Hardware Installation Guide 12 Preparing the Site Clearance Requirements ...
Страница 65: ...Cisco Nexus 93108TC FX ACI Mode Hardware Installation Guide 55 LEDs Power Supply LEDs ...
Страница 66: ...Cisco Nexus 93108TC FX ACI Mode Hardware Installation Guide 56 LEDs Power Supply LEDs ...