A P P E N D I X
D
Site Preparation and Maintenance Records
•
Site Preparation Checklist, on page 171
•
Contact and Site Information, on page 172
•
Chassis and Module Information, on page 173
Site Preparation Checklist
Planning the location and layout of your equipment rack or cabinet is essential for successful switch operation,
ventilation, and accessibility.
The following table lists the site planning tasks that we recommend that you complete before you install the
switch. Your completion of each task ensures a successful switch installation.
Verification Time and Date
Planning Activity
Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Physical access
Maintenance access
Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Airflow
Cisco Nexus 7706 Hardware Installation Guide
171
OL-31330-01
Содержание Nexus 7706
Страница 8: ...Cisco Nexus 7706 Hardware Installation Guide OL 31330 01 viii Contents ...
Страница 26: ...Cisco Nexus 7706 Hardware Installation Guide OL 31330 01 14 Preparing the Site Clearance Requirements ...
Страница 170: ...Cisco Nexus 7706 Hardware Installation Guide OL 31330 01 158 Switch Specifications Switch Specifications ...
Страница 178: ...Cisco Nexus 7706 Hardware Installation Guide OL 31330 01 166 LEDs Power Supply LEDs ...
Страница 190: ...Cisco Nexus 7706 Hardware Installation Guide OL 31330 01 IN 4 INDEX ...