Hardware Installation Guide for Cisco NCS 5500 Series Fixed-Port
Routers

First Published: 

2017-09-15

Americas Headquarters

Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
       800 553-NETS (6387)
Fax: 408 527-0883

Содержание NCS 5501

Страница 1: ...or Cisco NCS 5500 Series Fixed Port Routers First Published 2017 09 15 Americas Headquarters Cisco Systems Inc 170 West Tasman Drive San Jose CA 95134 1706 USA http www cisco com Tel 408 526 4000 800 553 NETS 6387 Fax 408 527 0883 ...

Страница 2: ... IMPLIED INCLUDING WITHOUT LIMITATION THOSE OF MERCHANTABILITY FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT OR ARISING FROM A COURSE OF DEALING USAGE OR TRADE PRACTICE IN NO EVENT SHALL CISCO OR ITS SUPPLIERS BE LIABLE FOR ANY INDIRECT SPECIAL CONSEQUENTIAL OR INCIDENTAL DAMAGES INCLUDING WITHOUT LIMITATION LOST PROFITS OR LOSS OR DAMAGE TO DATA ARISING OUT OF THE USE OR INABILITY TO USE T...

Страница 3: ...lines 5 Procure Tools and Equipment 5 Prepare Your Location 7 Prepare Yourself 8 Prepare Rack for Chassis Installation 10 C H A P T E R 3 Install the Chassis 13 Rack Mount the Chassis on a 4 Post Rack 13 Rack Mount the Chassis on a 2 Post Rack 22 Install the Air Filter 23 Ground the Chassis 25 Connect AC Power to the Chassis 28 Wiring a DC Power Connector 29 Connect DC Power to the Chassis 30 C H ...

Страница 4: ...er Module 47 Connecting Interface Ports 48 Connecting a Fiber Optic Port to the Network 49 Disconnecting Optical Ports from the Network 49 Maintaining Transceivers and Optical Cables 49 C H A P T E R 5 Verify Chassis Installation 51 C H A P T E R 6 Replace Modules Fan Trays and Power Supplies 53 Replace NCS 55A1 24H NCS 55A1 36H S NCS 5501 and NCS 5501 SE Fan Modules 53 Replace NCS 5502 and NCS 55...

Страница 5: ...A P P E N D I X B LEDs 69 Chassis LEDs 69 Fan Tray LED 71 Power Supply LEDs 72 Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers v Contents ...

Страница 6: ...Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers vi Contents ...

Страница 7: ...Information for the NCS 5500 Series Modular Routers NCS 5504 NCS 5508 and NCS 5516 can be found in the Hardware Installation Guide for Cisco NCS 5500 Series Modular Routers Note August 2017 Obtaining Documentation and Submitting a Service Request For information on obtaining documentation using the Cisco Bug Search Tool BST submitting a service request and gathering additional information see What...

Страница 8: ...Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers viii Preface Obtaining Documentation and Submitting a Service Request ...

Страница 9: ...FP ports The router has additional TCAM to support large prefix scale NCS 55A1 36H chassis It is a fixed port high density one rack unit form factor router that supports port density of 36 x QSFP ports each capable of supporting 10 GE via cable breakout 25 GE via cable breakout 40 GE QSFP or 100 GE QSFP28 transceivers NCS 55A1 24H chassis It is a fixed port high density one rack unit form factor r...

Страница 10: ...Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 2 NCS 5500 Series Fixed Port Router Overview NCS 5500 Series Fixed Port Routers ...

Страница 11: ...on page 7 Prepare Yourself page 8 Prepare Rack for Chassis Installation page 10 Review Installation Roadmap The figure Installation Workflow lists the steps to install Cisco NCS 5500 Series fixed port chassis and its components and prepare the system for operation Use this workflow as a reference to ensure that all components Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers...

Страница 12: ...k area clear smoke and dust free during and after installation Do not allow dirt or debris to enter into any laser based components Do not wear loose clothing jewelry or other items that could get caught in the router or other associated components Cisco equipment operates safely when used in accordance with its specifications and product usage instructions Be sure to power down a fixed configurat...

Страница 13: ...Guidelines Before installing the chassis verify that these guidelines are met Site is properly prepared so that there is sufficient room for installation and maintenance For specifications on the clearances required for chassis installation see Clearance Requirements on page 62 Operating environment is within the ranges listed in Environmental and Physical Specifications on page 59 Chassis is moun...

Страница 14: ... requirements the required length depends on the proximity of the switch to proper grounding facilities Ground lug 1 Crimping tool large enough to accommodate the girth of the lug Wire stripping tool ANSI Pair of 19 inch mounting brackets M4 screws to fix brackets 16 M4 screws to fix ground lug 2 Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 6 Prepare for Installation Pr...

Страница 15: ...s the chassis must be properly grounded to the earth ground See Prepare Your Location on page 7 Figure 2 Building with Rack Room Connected to Earth Ground Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 7 Prepare for Installation Prepare Your Location ...

Страница 16: ...nd the ground cord that connects the cuff to the ground ESD wrist straps are the primary means of controlling static charge on personnel Figure 3 Wearing the ESD Strap Note These images are for only representation purposes The chassis actual appearance and size may vary Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 8 Prepare for Installation Prepare Yourself ...

Страница 17: ...Figure 4 Handling the Chassis Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 9 Prepare for Installation Prepare Yourself ...

Страница 18: ...ded to earth ground as instructed in Prepare Your Location on page 7 Step 2 Secure the rack to the floor To bolt the rack to the floor a floor bolt kit also called an anchor embedment kit is required For information on bolting the rack to the floor consult a company that specializes in floor mounting kits such as Hilti see Hilti com for details Make sure that floor mounting bolts are accessible es...

Страница 19: ...Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 11 Prepare for Installation Prepare Rack for Chassis Installation ...

Страница 20: ...Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 12 Prepare for Installation Prepare Rack for Chassis Installation ...

Страница 21: ...tion describes how to use the rack mount kit provided with the router to install the Cisco NCS 55A1 36H S Cisco NCS 55A1 24H Cisco NCS 5501 Cisco NCS 5501 SE Cisco NCS 5502 and Cisco NCS 5502 SE routers into a cabinet or rack If the rack is on wheels ensure that the brakes are engaged or that the rack is otherwise stabilized Caution The following table lists the items contained in the rack mount k...

Страница 22: ...2 Rack mount guides 2 Rack mount slider rails 2 Grounding cover plate 1 Grounding lug 1 Table 4 Cisco NCS 5502 and Cisco NCS 5502 SE Router Rack Mount Kit Part Description Quantity Rack mount brackets 2 M4 x 8 mm Phillips flat head screws 18 M4 x 8mm Phillips pan head screws 2 Rack mount guides 2 Rack mount slider rails 2 Grounding cover plate 1 Grounding lug 1 Hardware Installation Guide for Cisc...

Страница 23: ...ned to four of the screw holes on the side of the chassis and then use four M4 flat head screws to attach the bracket to the chassis Cisco NCS 55A1 36H S NCS 5502 NCS 5502 SE Remove the grounding cover label and align the grounding cover plate with the grounding holes in the chassis and attach the rack mount brackets Note You can align four of the holes in the rack mount bracket to four of the scr...

Страница 24: ...the Cisco NCS 5501 SE and Cisco NCS 55A1 24H Note Figure 5 Rack mount brackets on the front side of Cisco NCS 5501 Figure 6 Rack mount brackets on the rear side of Cisco NCS 5501 Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 16 Install the Chassis Rack Mount the Chassis on a 4 Post Rack ...

Страница 25: ... Rack mount bracket 1 Top plate 5 M4 x 6mm Phillips flat head screws 2 Rack mount guides 3 Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 17 Install the Chassis Rack Mount the Chassis on a 4 Post Rack ...

Страница 26: ...gure 7 Rack Mount Brackets on the Front Side of Cisco NCS 55A1 36H S Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 18 Install the Chassis Rack Mount the Chassis on a 4 Post Rack ...

Страница 27: ...ws 5 Grounding cover label 1 Rack mount guide 6 Grounding cover plate 2 Rack mount slider rails 7 Rack mount brackets 3 Top plate 8 M4 x 6mm Phillips flat head screws 4 Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 19 Install the Chassis Rack Mount the Chassis on a 4 Post Rack ...

Страница 28: ...f Cisco NCS 5502 and NCS 5502 SE Figure 10 Rack Mount Brackets on the Rear Side of Cisco NCS 5502 and NCS 5502 SE Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 20 Install the Chassis Rack Mount the Chassis on a 4 Post Rack ...

Страница 29: ...t the ports are in the cold aisle install the top plate from the NEBS kit by pressing the ends of the plate on to the rack mount brackets The plate is required for NEBS compliance Step 3 Install the two rack mount guides on the chassis as follows a Position a rack mount guides on the side of the chassis with its two holes aligned to the two screw holes on the side of the chassis and then use two M...

Страница 30: ...rack mount guides on the slider rails Note c Holding the chassis level insert two screws 12 24 or 10 32 depending on the rack type through the holes in each of the rack mount brackets and into the cage nuts or threaded holes in the rack mounting rail d Tighten the 10 32 screws to 20 in lb 2 26 N m or tighten the 12 24 screws to 30 in lb 3 39 N m Rack Mount the Chassis on a 2 Post Rack The Cisco NC...

Страница 31: ...nt brackets on the Cisco NCS 5501 The bracket installation is the same for the Cisco NCS 5501 SE and Cisco NCS 55A1 24H Note Figure 11 Rack mount brackets on Cisco NCS 5501 Step 2 Install the router onto the 2 post rack as follows a With two people lift the router into position between the two rack posts b Move the router until the rack mount brackets come in contact with two rack posts c Hold the...

Страница 32: ... the chassis and the wire grid backing support is facing up Figure 12 Port side Inlet Air Filter b Slide the air filter into the air filter slot until it is seated fully within the slot c Hold the filter cover plate in place and tighten the middle panel to the top and bottom panels with six thumb screws And tighten the top and bottom panels separately to the faceplate using four screws Step 2 Inst...

Страница 33: ...uctor or operate the equipment in the absence of a suitably installed ground conductor Contact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available Warning Statement 1046 When installing or replacing the unit the ground connection must always be made first and disconnected last Warning Statement 1025 Use copper conductors only ...

Страница 34: ...quick connect connectors or other friction fit connectors Caution Step 1 Verify that the office ground cable is connected to the top of the rack and the office ground according to local site practice Step 2 Attach the ground cable Cisco NCS 55A1 24H Cisco NCS 5501 Cisco NCS 5501 SE Attach one end of the shelf ground cable 6 AWG cable to the ground point on the rear of the chassis using the specifi...

Страница 35: ...ver plate using the specified dual hole lug connector Figure 15 NCS 55A1 36H S Ground Lug M4 x 6mm pan head screws 2 Grounding lug 1 Figure 16 NCS 5502 Ground Lug M4 x 8mm pan head screws 2 Grounding lug 1 Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 27 Install the Chassis Ground the Chassis ...

Страница 36: ...the protective devices comply with local and national electrical codes Caution Cisco NCS 55A1 24H Cisco NCS 5501 Cisco NCS 5501 SE To provide full output power of 1100 W the nominal voltage rating value ranges between 100 V to 240 V depending on the standards in various countries Cisco NCS 55A1 36H S Cisco NCS 5502 Cisco NCS 5502 SE To provide full output power of 2000 W the nominal voltage rating...

Страница 37: ...nnector in the AC power module Figure 17 Connecting AC Power Step 3 Place the cable through the opening in the cable clamp Step 4 Slide the cable clamp toward the plug Step 5 Close the cable clamp on the shoulder of the power cable to secure the power cable Wiring a DC Power Connector Statement 1022 A readily accessible two poled disconnect device must be incorporated in the fixed wiring Warning H...

Страница 38: ...er or No 1 Phillips head screwdriver to loosen the set screws on the connector to freely accept the power wires The connector will accept 8 24 AWG wires 10 GA wires and wire temperature ratings of 90 ºC use what your local electrical code calls for Step 2 Strip 1 2 of insulation off the DC wires you will use Step 3 Insert the black DC negative wire into the right aperture on the connector and tigh...

Страница 39: ... is an option for 240 380 VDC power supply for maximum 1100 W power the fuse rating must not exceed 40 A Step 2 Measure and cut the cables as needed to reach the chassis from the fuse panel Step 3 Dress the power according to local practice Step 4 Connect the office battery and return cables according to the fuse panel engineering specifications Step 5 Insert the DC connector into the DC receptacl...

Страница 40: ...Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 32 Install the Chassis Connect DC Power to the Chassis ...

Страница 41: ...alling the transceiver in the line card Before removing such a transceiver from the router remove the cable from the transceiver To maximize the effectiveness and life of your transceivers and optical cables do the following Wear an ESD preventative wrist strap that is connected to an earth ground whenever handling transceivers The router is typically grounded during installation and provides an E...

Страница 42: ... Warning Connect to the Console Port Before you create a network management connection for the router or connect the router to the network you must create a local management connection through a console terminal and configure an IP address for the router You also can use the console to perform the following functions each of which can be performed through the management interface after you make th...

Страница 43: ...n the router accessory kit Network cabling should already be routed to the location of the installed router Step 1 Set your terminal to these operational values 115200 bps 8 data bits no parity 2 stop bits 115200 8N1 Step 2 Attach the terminal end of the cable to the interface port on the data terminal Step 3 Attach the other end of the cable to the console port Table 6 RJ 45 Straight through Cabl...

Страница 44: ...nection with an RJ 45 interface To prevent an IP address conflict do not connect the management Ethernet port until the initial configuration is complete Note To connect cables to the system management port attach Category 5 cables directly to the RJ 45 receptacle on the management Ethernet port Console port 2 Management Ethernet port 1 Hardware Installation Guide for Cisco NCS 5500 Series Fixed P...

Страница 45: ...ces in the network Note Before You Begin A console device must be connected with the router The router must be connected to a power source Determine the IP address and netmask needed for the following interfaces Management interface MgmtEth0 RP0 CPU0 0 and MgmtEth0 RP1 CPU0 0 Step 1 Power up the router by connecting each installed power supply to an AC circuit If you are using the combined or powe...

Страница 46: ...avoids repeating characters such as aaabbb Does not contain recognizable words from the dictionary Does not contain proper names Contains both uppercase and lowercase characters Contains numbers as well as letters Examples of strong passwords include the following If2CoM18 2004AsdfLkj30 Cb1955S21 Clear text passwords cannot include the dollar sign special character Note If a password is trivial su...

Страница 47: ...es Before you remove or install an SFP or SFP module read the installation information in this section Invisible laser radiation may be emitted from disconnected fibers or connectors Do not stare into beams or view directly with optical instruments Statement 1051 Warning Protect the line card by inserting a clean SFP SFP module cage cover shown in the figure below into the optical module cage when...

Страница 48: ...P or SFP module Removing and inserting an module can shorten its useful life so you should not remove and insert modules any more often than is absolutely necessary Caution When installing an SFP or SFP module you should hear a click as the triangular pin on the bottom of the module snaps into the hole in the receptacle indicating that the module is correctly seated and secured in the receptacle V...

Страница 49: ...ing a Bale Clasp SFP Module into a Port When installing an SFP or SFP module you should hear a click as the triangular pin on the bottom of the SFP module snaps into the hole in the receptacle indicating that the module is correctly seated and secured in the receptacle Verify that the SFP modules are completely seated and secured in their assigned receptacles on the line card by firmly pushing on ...

Страница 50: ...the SFP module with your index finger as shown in the figure below If the bale clasp is obstructed and you cannot use your index finger to open it use a small flat blade screwdriver or other long narrow instrument to open the bale clasp Step 4 Grasp the SFP module between your thumb and index finger and carefully remove it from the port as shown in the figure below Figure 22 Removing a Bale Clasp ...

Страница 51: ... plan to return it to the factory Step 6 Protect your line card by inserting clean SFP module cage covers into the optical module cage when there is no SFP module installed Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 43 Connect Router to the Network Installing and Removing SFP Modules ...

Страница 52: ...gure shows the 40 Gigabit optical QSFP transceiver The transceiver is used primarily in short reach applications in switches routers and data center equipment where it provides higher density than SFP modules The 100 Gigabit optical QSFP28 transceiver is similar to the 40 Gigabit optical QSFP transceiver Figure 23 40 Gigabit QSFP Transceiver Module Optical Electrical connection to the module circu...

Страница 53: ...y that you have the correct model for your network Step 4 For optical QSFP or QSFP28 transceiver modules remove the optical bore dust plug and set it aside Step 5 For QSFP or QSFP28 transceiver modules equipped with a pull tab hold the transceiver so that the identifier label is on the top Step 6 For QSFP or QSFP28 transceiver modules equipped with a bail clasp latch keep the bail clasp aligned in...

Страница 54: ...FP28 transceivers optical bore until you are ready to attach the network interface cable Do not remove the dust plug until you are ready to attach the network interface cable Attaching the Optical Network Cable Before You Begin Before removing the dust plugs and making any optical connections follow these guidelines Keep the protective dust plugs installed in the unplugged fiber optic cable connec...

Страница 55: ... plugs for future use Step 2 Inspect and clean the MPO connector s fiber optic end faces Step 3 Remove the dust plugs from the QSFP or QSFP28 transceiver module optical bores Step 4 Immediately attach the network interface cable MPO connectors to the QSFP or QSFP28 transceiver module see the figure below Figure 26 Cabling a 40 Gigabit QSFP or QSFP28 Transceiver Module Removing the 40 Gigabit QSFP ...

Страница 56: ...module socket Step 3 For QSFP or QSFP28 transceivers equipped with a pull tab latch see the below figure bottom view a Immediately install the dust plug into the transceiver s optical bore b Grasp the tab and gently pull to release the transceiver from the socket c Slide the transceiver out of the socket Figure 27 Removing the 40 Gigabit QSFP or 100 Gigabit QSFP28 Transceiver Module Step 4 Place t...

Страница 57: ... kept clean and dust free to maintain high signal accuracy and prevent damage to the connectors Attenuation loss of light is increased by contamination and should be below 0 35 dB Consider the following maintenance guidelines Transceivers are static sensitive To prevent ESD damage wear an ESD preventative wrist strap that is connected to the grounded chassis Do not remove and insert a transceiver ...

Страница 58: ...Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 50 Connect Router to the Network Maintaining Transceivers and Optical Cables ...

Страница 59: ...show environment temperature Displays temperature readings for card temperature sensors Each system controller route processor line card and fabric card has temperature sensors with two thresholds Minor temperature threshold When a minor threshold is exceeded a minor alarm occurs and the following actions occur for all four sensors Displays system messages Sends SNMP notifications if configured Lo...

Страница 60: ...using a router without dual route processor cards Cisco recommends that you immediately replace the fan card if just one fan is not working Note Step 4 hw module location loc shutdown or no hw module shutdown location loc Example sysadmin vm 0_RP0 hw module location loc shutdown Powers up or shuts down a card gracefully Step 5 show environment power Example sysadmin vm 0_RP0 show environment power...

Страница 61: ...em if the replacement is performed within 2 minutes The NCS 5501 and NCS 5501 SE routers support NCS 1RU FAN FW port side intake airflow and NCS 1RU FAN RV port side exhaust airflow fan modules The NCS 55A1 24H NCS 55A1 36H S routers support NC55 A1 FAN FW port side intake airflow and NC55 A1 FAN RV port side exhaust airflow fan modules Note The airflow direction must be the same for all power sup...

Страница 62: ...chassis If the fan module does not go all the way into the slot do not force it Remove the fan module and verify that it is the correct type for your router and in the correct orientation Note c If the chassis is powered on listen for the fans You should immediately hear them operating If you do not hear them ensure that the fan module is inserted completely in the chassis d Verify that the fan mo...

Страница 63: ...Step 4 Align the fan module to the open fan tray slot in the chassis and press the module all the way into the slot until the left and right latches click and locked on the chassis Step 5 If the chassis is powered on listen for the fans You should immediately hear them operating If you do not hear them ensure that the fan module is inserted completely in the chassis Step 6 Verify that the fan modu...

Страница 64: ...w PSU If the PSU does not go all the way into the slot do not force it Remove the PSU and verify that it is the correct type for your router and in the correct orientation Note Step 5 Connect the PSU cable Step 6 If the power supply is connected to a DC circuit turn on the circuit breaker for the DC power source The following figure shows the NCS 5501 router The procedure is the same for the NCS 5...

Страница 65: ... 55A1 36H S Power Supply Figure 32 Remove NCS 5502 and NCS 5502 SE Power Supply Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 57 Replace Modules Fan Trays and Power Supplies Replace Power Supply ...

Страница 66: ...Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 58 Replace Modules Fan Trays and Power Supplies Replace Power Supply ...

Страница 67: ... Connectors and Cables page 66 Environmental and Physical Specifications Table 7 Environmental and Physical Specifications for NCS 5501 Environmental Ranges 32 to 104 F 0 to 40 C Operating Temperature 40 to 158 F 40 to 70 C Non operating storage temperature 5 to 95 non condensing Humidity 0 to 9842 feet 0 to 3000 meters Altitude Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Rout...

Страница 68: ...NCS 5501 SE 23 5 lbs 10 66 kgs Weight Table 8 Environmental and Physical Specifications for NCS 55A1 Environmental Ranges 32 to 104 F 0 to 40 C Operating Temperature 40 to 158 F 40 to 70 C Non operating storage temperature 5 to 95 non condensing Humidity 0 to 9842 feet 0 to 3000 meters Altitude NEBS compliant Less than 78 dB sound power at 27 C NCS 5500 series employs a fan speed control algorithm...

Страница 69: ...dB Ambient temperature between 30 C and 42 C Sound Power 84 dB Sound Pressure 75 dB Ambient temperature 42 C Sound Power 84 dB Sound Pressure 89 dB NCS 5500 series employs a fan speed control algorithm based on the environmental temperature to reduce the acoustics noise Ambient temperature is measured 6 in front of the system air intake cold aisle Note Acoustic Noise Physical Dimensions 2 Rack Uni...

Страница 70: ...ower supplies and fan modules 5 6 0 in 15 24 cm front clearance for air intake exhaust 2 Chassis depth 3 Weight Quantity and Power Consumption NCS 5501 Fixed Chassis Weight Quantity and Power Consumption The NCS 5501 fixed chassis offers two hot swappable power supplies providing 1 1 redundancy For 1 1 redundancy mode there must be two subsystems each providing enough power supply to maintain the ...

Страница 71: ...S 5501 SE Fan Tray Power Consumption Total Fan Tray Power Consumption Quantity of Fan trays Power Consumption of Each Fan Tray Ambient Temperature 22W 2 11W 25 C 82W 2 41W 55 C NCS 55A1 Fixed Chassis Weight Quantity and Power Consumption The NCS 55A1 fixed chassis offers two hot swappable power supplies providing 1 1 redundancy For 1 1 redundancy mode there must be two subsystems each providing en...

Страница 72: ...isco NCS 5500 1100W AC Power Supply Reverse Airflow Port side exhaust NCS 1100W ACRV Cisco NCS 5500 950Watts DC Power Supply Forward Airflow Port side intake NCS 950W DCFW Cisco NCS 5500 1100W DC Power Supply Reverse Airflow Port side exhaust NCS 1100W DCRV Fan Tray 3 maximum See Fan Tray Power Consumption in NCS 55A1 for details See Fan Tray Power Consumption in NCS 55A1 for details 10 Oz NC55 A1...

Страница 73: ...wer Weight per Unit Component Chassis 2000W at 55 C 1450W at 27 C 52 5 lbs 23 8136 kgs Cisco NCS 5502 Chassis NCS 5502 2400W at 55 C 1850W at 27 C 55 5 lbs 25 17438 kgs Cisco NCS 5502 SE Chassis NCS 5502 SE Power Supply NA NA 2 8 lb Cisco NCS 5500 DC 2KW Power Supply Reverse Airflow Port side exhaust NC55 2KW DCRV Cisco NCS 5500 DC 2KW Power Supply Forward Airflow Port side intake NC55 2KW DCFW Ci...

Страница 74: ...support tables list html To see the transceiver specifications and installation information see http www cisco com c en us support interfaces modules transceiver modules products installation guides list html RJ 45 Connectors The RJ 45 connector connects Category 3 Category 5 Category 5e Category 6 or Category 6A foil twisted pair or unshielded twisted pair cable from the external network to the f...

Страница 75: ...Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 67 System Specifications RJ 45 Connectors ...

Страница 76: ...Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 68 System Specifications RJ 45 Connectors ...

Страница 77: ...left front of the chassis NCS 55A1 36H S Attention ATTN Status STAT Alarm ALRM and SYNC LEDs are located along the left front of the chassis NCS 5502 Attention ATTN STATUS and ALARM LEDs are located on the upper left front of the chassis Table 15 Fixed Port Chassis LED Descriptions Status Color LED The operator has activated this LED to identify this chassis Flashing blue ATTN This chassis is not ...

Страница 78: ... cord not plugged in PSU not inserted properly Input power not good Flashing green Applies to NCS 5502 only Critical alarm Relating to voltage rail failures Flashing Red Major alarm system scope including RP0 Amber Minor alarm system scope including RP0 Flashing Amber No alarm Off Time core is synchronized to an external source including IEEE1588 Green SYNC Does not apply to NCS 5501 or 5502 Syste...

Страница 79: ...atus LED NCS 5502 Fan Tray LED Fan tray modules are located on the back side of the chassis Each NCS 5502 fan tray module has a Status LED Status Color LED Fans are operating normally Green STATUS One or more fans are failed Flashing Amber Fan tray is inserted and pending to come online Amber Fan tray is not receiving power Off Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Route...

Страница 80: ...ed in the chassis Off Flashing green Either all of the installed power supplies are not receiving power or an uninstalled power supply is not receiving power Off Off Power supply is operating but a warning condition has occurred possibly one of the following conditions High temperature High power Slow power supply fan Low voltage Power supply is installed in the chassis but was disconnected from t...

Страница 81: ...nput power source but not outputting power to the router Flashing Green Power supply failure due to one of the following conditions Over voltage Over current Over Temperature Fan failure Amber Power supply is operating but a warning condition has occurred due to one of the following conditions High temperature High power Slow fan Flashing Amber Power supplies are not receiving power Off Hardware I...

Страница 82: ...Hardware Installation Guide for Cisco NCS 5500 Series Fixed Port Routers 74 LEDs Power Supply LEDs ...

Отзывы: