A P P E N D I X
E
Site Preparation and Maintenance Records
•
Site Preparation Checklist, on page 65
•
Contact and Site Information, on page 66
•
Chassis and Module Information, on page 67
Site Preparation Checklist
Planning the location and layout of your equipment rack or cabinet is essential for successful switch operation,
ventilation, and accessibility.
The following table lists the site planning tasks that we recommend that you complete before you install the
switch. Your completion of each task ensures a successful switch installation.
Verification Time and Date
Planning Activity
Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Physical access
Maintenance access
Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Airflow
Cisco Nexus 93240YC-FX2 NX-OS Mode Switch Hardware Installation Guide
65
Содержание N9K-C93240YC-FX2
Страница 6: ...Cisco Nexus 93240YC FX2 NX OS Mode Switch Hardware Installation Guide vi Contents ...
Страница 16: ...Cisco Nexus 93240YC FX2 NX OS Mode Switch Hardware Installation Guide 6 Overview Overview ...
Страница 70: ...Cisco Nexus 93240YC FX2 NX OS Mode Switch Hardware Installation Guide 60 LEDs LEDs ...
Страница 74: ...Cisco Nexus 93240YC FX2 NX OS Mode Switch Hardware Installation Guide 64 Additional Kits Vent Bracket ...