![Cisco G1 - Network Processing Engine G1 Скачать руководство пользователя страница 42](http://html.mh-extra.com/html/cisco/g1-network-processing-engine-g1/g1-network-processing-engine-g1_installation-and-configuration-information_63933042.webp)
7-42
Network Processing Engine and Network Services Engine Installation and Configuration
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Installing the NPE-G1 or NPE-G2
Figure 7-29
Connecting DC-Input Power to a Cisco uBR7246VXR Router
Step 3
SIf necessary, use a wire stripper to strip approximately 0.55 inch (14 mm) from the –V, +V, and ground
leads.
Note
The ground lead for the Cisco uBR7200 series DC-input power supply consists of a two-hole grounding
lug that connects to an M5 grounding receptacle; you do not need to strip this ground lead.
Figure 7-30
Stripping the DC-Input Lines
1
Power switch
6
–V lead
2
Power receptacle
7
M4 studs
3
Captive installation screw
8
+V lead
4
M5 grounding receptacles
9
Handle
5
M5 grounding lug
66407
3
8
1
2
9
7
5
6
4
1
0.55 in. (14 mm)
57019
1