![Cisco G1 - Network Processing Engine G1 Скачать руководство пользователя страница 32](http://html.mh-extra.com/html/cisco/g1-network-processing-engine-g1/g1-network-processing-engine-g1_installation-and-configuration-information_63933032.webp)
7-32
Network Processing Engine and Network Services Engine Installation and Configuration
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Installing the NPE-G1 or NPE-G2
Figure 7-19
Installing the Rear Cable-Management Brackets with an NPE-G1 or NPE-G2—Router
Front-Mounted
Step 1
If the back of the router protrudes from the rack, place the cable-management brackets against the router
as shown in
Figure 7-19
.
Step 2
Insert two screws into each bracket, and tighten them to the router.
Step 3
Insert the GBIC, SFP module, or RJ-45 cables into the interface ports on the NPE-G1 or NPE-G2.
Step 4
Place the cables through the cable-management brackets.
You have finished installing the cable-management brackets. Go to the
“Reconnecting Input Power and
Powering Up the Router” section on page 7-35
.
Installing the Rear Cable-Management Brackets on a Rear-Mounted Router (Optional)
Use the instructions in this section to attach the cable-management brackets if you have a rear-mounted
Cisco 7200 VXR router.
1
Screws
H6423
G I G A B I T E T H E R N E T 0 / 1
R J 4 5
G B I C
E N
R X
T X
L I N K
CONSOLE
AUX
G I G A B I T E T H E R N E T 0 / 1
R J 4 5
G B I C
E N
R X
T X
L I N K
G I G A B I T E T H E R N E T 0 / 1
R J 4 5
G B I C
E N
R X
T X
L I N K
C P U
R E S E T
C O M PA C T F L A S H
POWER
OK
S L O T
A C T I V E
NETWORK PROCESSING ENGINE - G1
66749
1
1