PreparingForCiscoCMX3375applianceComponentInstallation
This section includes information and tasks that help prepare the Cisco CMX 3375 appliance for component
installation.
Required Equipment For Service Procedures
The following tools and equipment are used to perform the procedures in this chapter:
• T-30 Torx driver (supplied with replacement CPUs for heatsink removal)
• #1 flat-head screwdriver (supplied with replacement CPUs for heatsink removal)
• #1 Phillips-head screwdriver (for M.2 SSD and intrusion switch replacement)
• Electrostatic discharge (ESD) strap or other grounding equipment such as a grounded mat
Removing the Server Top Cover
Step 1
Remove the top cover:
a) If the cover latch is locked, use a screwdriver to turn the lock 90-degrees counterclockwise to unlock it.
b) Lift on the end of the latch that has the green finger grip. The cover is pushed back to the open position as you lift
the latch.
c) Lift the top cover straight up from the server and set it aside.
Step 2
Replace the top cover:
a) With the latch in the fully open position, place the cover on top of the server about one-half inch (1.27 cm) behind
the lip of the front cover panel. The opening in the latch should fit over the peg that sticks up from the fan tray.
b) Press the cover latch down to the closed position. The cover is pushed forward to the closed position as you push
down the latch.
c) If desired, lock the latch by using a screwdriver to turn the lock 90-degrees clockwise.
Cisco 3375 Appliance for Cisco Connected Mobile Experiences Installation Guide
35
Maintaining the Cisco 3375 Appliance for Cisco Connected Mobile Experiences
Preparing For Cisco CMX 3375 appliance Component Installation