C H A P T E R 4
Guidelines for a Standalone Equipment Shelf or Tabletop Installation
Installing the Controller on a Standalone Equipment Shelf or Tabletop
Guidelines for Rack Installation
Attaching Front Rack-Mount Brackets
Mounting the Controller in the Rack
Attaching the Cable Management Bracket
Recommended Tools and Supplies
Attaching a Chassis Ground Connection
Connecting the Console Port Cable
Procedure for Connecting the Console Port Cable
Connecting to the Mini USB Console Port
Management Ethernet Port Cable Connection
Power Up and Initial Configuration
C H A P T E R 5
Checking Conditions Prior to System Startup
Performing the Initial Configuration on the Controller
Using the Cisco Setup Command Facility
Using the Cisco IOS-XE CLI—Manual Configuration
Configuring the Controller Hostname
Configuring the Enable and Enable Secret Passwords
Configuring the Console Idle Privileged EXEC Timeout
Gigabit Ethernet Management Interface Overview
Default Gigabit Ethernet Configuration
Configuring Gigabit Ethernet Interfaces
Saving Your Controller Configuration
Cisco Catalyst 9800-80 Wireless Controller Hardware Installation Guide
v
Contents