Chassis-Lifting Guidelines
The chassis is not intended to be moved frequently. Before you install the system, ensure that your site is
properly prepared so that you can avoid having to move the chassis later to accommodate power sources and
network connections.
Each time you lift the chassis or any heavy object, follow these guidelines:
• Ensure that your footing is solid, and balance the weight of the chassis between your feet.
• Lift the chassis slowly; never move suddenly or twist your body as you lift.
• Keep your back straight and lift with your legs, not your back. If you must bend down to lift the chassis,
bend at the knees, not at the waist, to reduce the strain on your back muscles.
• Do not remove installed components from the chassis.
• Always disconnect all external cables before lifting or moving the chassis.
Tools and Equipment
The following tools and equipment are recommended as the minimum necessary equipment to install the
Cisco Catalyst 9800-80 Wireless Controller. You may need additional tools and equipment to install associated
equipment and cables. You may also require test equipment to check electronic and optical signal levels,
power levels, and communications links.
• Philips hand screwdriver
• 3.5-mm flat-blade screwdriver
• Tape measure (optional)
• Level (optional)
• Power drill
• 8-gauge wire
• Rack-mount brackets
• Cable-management brackets
Unpacking and Verifying Shipping Contents
When you receive your chassis, perform the following steps and use the shipping contents checklist in the
following section.
Step 1
Inspect the box for any shipping damage. (If there is damage, contact your Cisco service representative).
Step 2
Unpack the Cisco Catalyst 9800-80 Wireless Controller.
Step 3
Perform a visual inspection of the chassis.