Date
Time
Verified
By
Activity
Task No.
EMI evaluation
• Distance limitations for signaling
• Site wiring
• RFI levels
6
2
Verify that each power supply installed in the chassis has a dedicated AC source circuit.
3
Refer to the power supply'VA rating as a sizing criteria in determining the output required by the UPS.
The power supply kVA rating value is listed in the specifications table for each power supply in Appendix
A (power supply specifications).
Cisco Catalyst 9600 Series Switches Hardware Installation Guide
27
Preparing for Installation
Site Preparation Checklist