Figure 19: Attaching the mounting feet for Table-Mounting or Shelf-Mounting
Rubber mounting feet
1
Step 3
Place the switch on the table or shelf near an AC power source.
What to do next
When you complete the switch installation, see
After Switch Installation, on page 28
for information on
switch configuration.
After Switch Installation
• Configure the switch using the Web User Interface. For more information, see "Configuring the Switch
Using the Web User Interface" topic in the
Software Configuration Guide
.
• Connect the required devices to the switch ports.
• Turn on the power supply switches to power up the system. While powering up, the switch performs a
series of bootup diagnostic tests.
The switch is designed to boot up in less than 30 minutes, provided that the
neighboring devices are in fully operational state.
Note
• Verify port connectivity after connecting devices to the switch ports. The LED turns green when the
switch and the attached device have a link.
Cisco Catalyst 9200 Series Switches Hardware Installation Guide
28
Installing the Switch
After Switch Installation
Содержание Catalyst 9200 Series
Страница 2: ... 2018 2020 Cisco Systems Inc All rights reserved ...
Страница 6: ...Cisco Catalyst 9200 Series Switches Hardware Installation Guide vi Contents ...
Страница 20: ...Cisco Catalyst 9200 Series Switches Hardware Installation Guide 14 Product Overview Network Configurations ...
Страница 78: ......