
Table 4: Environmental Parameters
Range
Subparameter
Parameter
0 degrees C to +40 degrees C (32 degrees F to 104 degrees F)
Operating
Temperature
-5 degrees C to +50 degrees C (23 degrees F to 122 degrees F)
Short Term
1
-40 degrees C to +70 degrees C (-40 degrees F to 158 degrees
F)
Storage
20 to 80 percent non-condensing
Operating
Humidity
10 to 95 percent non-condensing
Storage
197 ft. (60m) below to 5,905 ft. (1,800m) above sea level,
maximum 40 degrees C (104 degrees F)
Operating
Altitude
5,905 ft. (1,800m) to 13,123 ft. (4000m) above sea level,
maximum 30 degrees C (86 degrees F)
197 ft. (60m) below to 49,212 ft. (15,000m) above sea level
Non-operating
81 dB [L
WAd
]
2
23 degrees C (73.4
degrees F)
Acoustic Noise
83 dB[L
WAd
]
2, 4
26 degrees C (78.8
degrees F)
81 dB [L
WAd
]
2
27 degrees C (80.6
degrees F)
96.5 dB [L
WAd
]
3, 4
Max. Fan Speed
26 degrees C (78.8
degrees F)
Notes
:
1
Short-term refers to a period of not more than 96 consecutive hours and a total of not more than 15 days
in 1 year. (This refers to a total of 360 hours in any given year, but no more than 15 occurrences during
that 1-year period.)
2
Within GR-63 limits for unattended operation.
3
Measured during GR-63 R4-97 testing.
4
Measured with DPC2 installed.
Environmental Standards
The ASR 5500 has been successfully tested for compliance with the environmental standards listed in table
below.
ASR 5500 Installation Guide
17
Technical Specifications
Environmental Standards
Содержание ASR 5500
Страница 12: ...ASR 5500 Installation Guide xii Contents ...
Страница 16: ...ASR 5500 Installation Guide xvi About this Guide Contacting Customer Support ...
Страница 40: ...ASR 5500 Installation Guide 24 Technical Specifications Chassis Grounding ...
Страница 74: ...ASR 5500 Installation Guide 58 Card Installation Save Shipping Cartons ...
Страница 88: ...ASR 5500 Installation Guide 72 MIO Port Cabling Cleaning Fiber Optic Connectors ...
Страница 112: ...ASR 5500 Installation Guide 96 System Power up show leds Command ...
Страница 130: ...ASR 5500 Installation Guide 114 Initial System Configuration Additional Configuration Tasks ...
Страница 164: ...ASR 5500 Installation Guide 148 Replaceable Components Returning Failed Components ...
Страница 186: ...ASR 5500 Installation Guide 170 Console Port to Cisco Server Cabling Configuration ...
Страница 192: ...ASR 5500 Installation Guide 176 RMA Shipping Procedures Rear Cards ...