NA
40° C at sea
level or 35° C
at 1500 meter
NA
• QDD-400G-ZR-S –
supported on all 400G
ports
• QDD-400G-ZRP-S –
supported on
even-numbered 400G
ports
8800-LC-36FH
NA
40° C at sea
level or 35° C
at 1500 meter
NA
• QDD-400G-ZR-S –
supported on all 400G
ports
• QDD-400G-ZRP-S –
supported on
even-numbered 400G
ports
88-LC0-36FH-M
NA
40° C at sea
level or 35° C
at 1500 meter
NA
• QDD-400G-ZR-S –
supported on all 400G
ports
• QDD-400G-ZRP-S –
supported on
even-numbered 400G
ports
88-LC0-36FH
The QSFP transceiver module has a pull-tab latch. To install a transceiver module, follow these steps:
Procedure
Step 1
Attach an ESD wrist strap to yourself and a properly grounded point on the chassis or the rack.
Step 2
Remove the transceiver module from its protective packaging.
Step 3
Check the label on the transceiver module body to verify that you have the correct model for your network.
Do not remove the dust plug until you’re ready to attach the network interface cable. Dust plug is not shown
in the images.
Step 4
Hold the transceiver by the pull-tab so that the identifier label is on the top.
Step 5
Align the transceiver module in front of the module’s transceiver socket opening and carefully slide the
transceiver into the socket until the transceiver contact with the socket electrical connector.
Hardware Installation Guide for Cisco 8800 Series Routers
82
Connect Router to the Network
Installing the Transceiver Module
Содержание 8800 Series
Страница 6: ...Hardware Installation Guide for Cisco 8800 Series Routers vi Contents ...
Страница 30: ...Hardware Installation Guide for Cisco 8800 Series Routers 24 Unpack and Install the Chassis Unpack the Chassis ...
Страница 112: ...Hardware Installation Guide for Cisco 8800 Series Routers 106 LEDs Line Card LEDs ...