• Base station: LAN connection close to the mounting location.
• Base station: If you do not use PoE, a power outlet close to the mounting location.
• Repeater: A power outlet close to the mounting location.
• Ensure that the base station can communicate with the network (see
Install the Base Station, on page
). After it can communicate and the LED is green, you can unplug the cables.
Determine the best placement, taking into account the coverage area and the building construction materials.
• If you have a 110 Single-Cell Base Station, you may need to add another 110 Single-Cell Base Station
or additional 110 Repeaters.
• If you have a 210 Multi-Cell Base Station, you may need to add additional base stations or repeaters.
You can use the site survey tool on the handset to plan placement.
Procedure
Step 1
Hold the ceiling mount bracket in the desired location.
Step 2
Mark the screw placement.
Step 3
Install the plugs as described by the manufacturer.
Step 4
Install the screws through the bracket and into the plugs.
Cisco IP DECT 6800 Series Administration Guide
27
Hardware Installation
Mount the Base Station or Repeater on the Ceiling
Содержание 6823
Страница 48: ...Cisco IP DECT 6800 Series Administration Guide 40 Hardware Installation Charge the Handset Battery ...
Страница 170: ...Cisco IP DECT 6800 Series Administration Guide 162 Maintenance Base Station States ...
Страница 184: ...Cisco IP DECT 6800 Series Administration Guide 176 Troubleshooting Generate PCAP Logs ...
Страница 194: ...Cisco IP DECT 6800 Series Administration Guide 186 Worksheets Handset Configuration Parameters Worksheet ...