Index
IN-4
Catalyst 4500 E-Series Switches Installation Guide
OL-13972-02
I
installation
connecting to a power source
C-2
starting the terminal-emulation software
C-2
installing
AC-input power supplies
4-4 to 4-7
DC-input power supplies
4-8 to 4-13
fan assemblies
4-13 to 4-15
installing switches in racks
3-4 to ??
L
LEDs
checking power supplies
5-3
checking supervisor engines
5-2
POST results
C-3
See also specific types of LEDs
LINK LEDs (table)
5-8
M
Mux buffers
4-15, 5-7
O
OUTPUT FAIL LED
environmental monitoring
A-40
P
packaging materials
B-1
port status LEDs
5-9
POST
LEDs
C-3
power cords
See AC-input power cords
power requirements
branch circuit requirements
2-13
site preparation
2-13
UPS selection
2-13
power supplies
Catalyst 4503-E switches
1-4
Catalyst 4506-E switches
1-8
Catalyst 4507R+E switches
1-20
Catalyst 4507R-E switches
1-12
Catalyst 4510R+E switches
1-24
Catalyst 4510R-E switches
1-16
DC power cable leads color coding
2-14
LEDs
5-3
R
rack-mounting
switches
3-5
rack-mount kits
guidelines
3-2
Redundancy modules
4-15, 5-7
remote power cycling feature
components (figure)
A-39
ferrite bead
A-39
operation
A-39
overview
A-39
switch settings and operation
A-40
removing
AC-input power supplies
4-4
DC-input power supplies
4-8
repacking switches
B-1
replacing
AC-input power supplies
4-6 to 4-7
DC-input power supplies
4-11 to 4-13