Cisco 1800 Series Integrated Services Routers (Fixed) Hardware Installation Guide
OL-6425-03
Chapter 2 Preinstallation Requirements
Installation Checklist
For more information about antenna coverage and optimal usage, see the following documents:
•
Cisco Multiband Swivel-Mount Dipole Antenna
•
Cisco Multiband Diversity Omnidirectional Ceiling-Mount Antenna
•
Cisco Multiband Wall-Mount, Corner-Mount, or Mast-Mount Antenna
Site Configuration
The following precautions will help you plan an acceptable operating environment for your router and
will help you avoid environmentally caused equipment failures:
•
Ensure adequate air circulation in the room where your router operates. Electrical equipment
generates heat. Without adequate air circulation, ambient air temperature may not cool equipment
to acceptable operating temperatures.
•
To avoid damaging equipment, always follow the ESD-prevention procedures described in the
“Preventing Electrostatic Discharge Damage” section on page 2-3
. Damage from static discharge
can cause immediate or intermittent equipment failure.
•
Ensure that the chassis cover and module back panels are secure. All empty network module slots,
interface card slots, and power supply bays must have filler panels installed. The chassis is designed
to allow cooling air to flow within it through specially designed cooling slots. A chassis with
uncovered openings permits air leaks, which may interrupt and reduce the flow of air across internal
components.
Installation Checklist
The sample installation checklist lists items and procedures for installing a new router. Make a copy of
this checklist and record the information in each column as you complete each task. Include a copy of
the checklist for each router in your Site Log (described in the
“Creating a Site Log” section on
page 2-6
).
Installation Checklist for Site_____________________________________________
Router Name_______________________________________________________
Task
Verified by
Date
Installation Checklist copied
Background information placed in Site Log
Site power voltages verified
Installation site power check completed
Required tools available
Additional equipment available
Router received
Router quick start guide received