background image

                                                                         

Wallbox ePark

Instruction manual

58

8

SCADA Client

In remote connections, where is required communicate via 3G/4G 
data with the Charge point in order to monitor its parameters, it 
should be noted that there will be a HIGH consumption of data.

The IP address assigned previously, is useful to connect with the Charge Point 
in order to monitor the real-time status. 

The main way to connect is using the 

PowerStudio client software

 (Supplied 

by 

CIRCUTOR

) or you can download it from 

CIRCUTOR

 Webpage.

NOTE: 

Java software needs to be installed on your computer in order to 

run the client software, please, download last version from: www.java.com 

Содержание Wallbox ePark

Страница 1: ...Wallbox ePark INSTRUCTION MANUAL M262B01 03 19A...

Страница 2: ...t specifi cations set out in this instruction manual without prior notice CIRCUTOR SA on its web site supplies its customers with the latest versions of the de vice specifications and the most updated...

Страница 3: ...No part of this manual can be reproduced copied translated or transmitted in any form or by any means without the prior written permission of the original manufacturer Information provided in this man...

Страница 4: ...ing 11 4 How to configure it 12 A Introduction 12 B What s needed 12 C Connection 13 5 Setup Webpage 14 A Dashboard 14 B Network 21 C Modem 23 D Security 25 E Locale 26 F Time 27 G Integrations 28 H F...

Страница 5: ...Wallbox ePark Instruction manual 5 8 Monitoring 58 9 Technical Data 60 Need help 63 Guarantee 63...

Страница 6: ...from it with step by step configuration instructions ATTENTION Indicates that the damage to property can occur if appropriate precautions are not taken 1 Complies with IEC 61851 Electric vehicle condu...

Страница 7: ...ccording to your country Do not make repairs or manipulations with the unit energised Only trained and qualified personnel should have access to electrical parts inside the device Check the installati...

Страница 8: ...Wallbox ePark Instruction manual 8 2 1 LED beacon 2 Cable glands 3 Plugs 1 4 Display 5 RFID 6 Closing box holes 7 Wall support holes 1 Plugs may vary depending on the model 888 1 2 3 3 7 7 5 2 6 4...

Страница 9: ...n complying with ISO14443A B Ethernet TCP IP communication for remote supervision and configuration 3G Modem optional For those places where wired communications are not sufficient Energy metering Int...

Страница 10: ...the Display shows the following sequence of messages 2 Plug the cable to the vehicle choose one available socket in case there are more than one and plug the cable to the Charge Point Once done the D...

Страница 11: ...ed Beacon turns Green and the Display shows the summary of the charge transaction 2 Unplug the cable from both sides Once done the connector becomes available and the Display shows the following seque...

Страница 12: ...preferences or specific setup using integrated Ethernet communication port allocated in the main controller device B What s needed Before proceeding with the configuration make sure all the following...

Страница 13: ...ailable on the network Connecting a PC directly with the Charge Point needs to be done with static IP address The PC and the Charge Point must be in the same network and in the same range C Connection...

Страница 14: ...r options To access the setup web page open a web browser and enter the IP address previously configured A Dashboard Overview As a relevant information the Summary shows Firmware version Version of th...

Страница 15: ...llbox ePark Instruction manual 15 Setup Webpage Devices Status As a relevant information the Devices Status shows Device name Name of the devices inside the Charge Point Status OK online NOT OK offlin...

Страница 16: ...on shown in this section is basically relative to the state of the Control Board of the Charge Point This is necessary for the technical service staff but does not show any information regarding the e...

Страница 17: ...section shows the public IP the signal strength and other information related to the SIM Card Good signal Bad signal Moderate signal 80 dBm 90 dBm 50 dBm 100 dBm The following diagram shows an approxi...

Страница 18: ...18 Drivers The information shown in this section is regard to the drivers that the Charge Point needs in order to recognize the different devices inside the Charge Point such as the meters the Mode 3...

Страница 19: ...nformation shown in this section is basically related to the internal behavior of the Charge Point This is necessary for the technical service staff but does not show any information regarding the ext...

Страница 20: ...own in this section are automatically produced by the Charge Point it is a detailed list of the charging sessions system performance or user activities This logs are created since Charge Point is powe...

Страница 21: ...Wallbox ePark Instruction manual 21 B Network This section provides basic configuration of the network parameters Clicking over the Network tab next image will appear...

Страница 22: ...ess Raven XE H2295EW select this option only when SIERRA Wireless RAVEN XE cellular router is connected to the charge point SIERRA Wireless AirLink LS300 select this option only when SIERRA Wireless A...

Страница 23: ...ark Instruction manual 23 C Modem Before configuring the cellular communications insert the SIM Card on the modem as shown If the three LEDs are not on after inserting the SIM card check the modem con...

Страница 24: ...are not needed insert 1234 on both fields Password Ping IP IP address where the Charge Point pings Ping period minutes Period between pings Reset timer hours Timer to reset the modem and communicatio...

Страница 25: ...the Setup Webpage All parameters are disabled from factory settings Value Description Authentication ON authentication enableb OFF authentication disabled User Name Username and Password authenticatio...

Страница 26: ...llbox ePark Instruction manual 26 E Locale This section allows to change the language of the Charge Point choosing among several options For availability of languages please consult your local supplie...

Страница 27: ...e and region time for the Charge Point Value Description Time Zone Select the regional time for the Charge Point according to the location Time Current date and time of the Charge Point Primary NTP Se...

Страница 28: ...ction allows to enable and disable OCPP service of the Charge Point Both OCPP 1 5 and OCPP 1 6 are available on the last firmware version For more information about the parameters and configuration pl...

Страница 29: ...firmware can be upgraded remotely by clicking on the Select File button A window will pop up in order to choose the file then click on upload To obtain the latest firmware version please contact CIRCU...

Страница 30: ...remotely by clicking on the Select File button Intended ONLY for Service Staff to restore the Charge Point A window will pop up in order to choose the file then click on upload To obtain the appropria...

Страница 31: ...Wallbox ePark Instruction manual 31...

Страница 32: ...OCPP is to offer a uniform solution for the communication between Charge Point and a Central System With this open protocol it is possible to connect any Central System with any Charge Point regardle...

Страница 33: ...tab Public Address Manager establishes where the Charge Point must obtain the public IP address in order to send it later to the backend Different values can be selected in the Address Type section C...

Страница 34: ...ame time Go back to setup web page and click on the Integrations tab choose the option selected under Available integrations according to your backend policies as shown in the picture NOTE Charge Poin...

Страница 35: ...egration selected on the Charge Point it starts as configuration mode and all fields are empty Settings are always stored even when the Charge Point is powered off or even the integration is disabled...

Страница 36: ...Description ID Charge Point identifier Public IP timeout Maximum waiting time to obtain the public IP address of the 3G modem OCPP Internal port Incoming listening port for remote request internal OCP...

Страница 37: ...all the requests Check Central System URL according to the backend policies please contact to the Central System to get the configuration parameters Value Description ID Tag Endianness Storage type fo...

Страница 38: ...PP Settings tab Check OCPP Settings according to the backend policies please contact to the Central System to get the configuration parameters Before making any changes read following table and set ea...

Страница 39: ...only locally Authorize always in offline mode YES If user is not present locally in the local white list and charge point cannot ask to the backend user is allowed to start a new charge transaction N...

Страница 40: ...is function Energy for Start Stop transaction PARTIAL Consumed value of energy by the vehicle sent be tween start and stop TOTAL actual count of the total accumulated energy meter sent between start a...

Страница 41: ...uest before starting a new remote charge transaction request NO Charge point starts a new remote charge transaction without authorization request Active Power in MeterValues YES Send power Power Activ...

Страница 42: ...on manual 42 Once done please do not forget to save changes using Save button in the upper right bar Please wait until the new configuration is being applied to the Charge Point A message is displayed...

Страница 43: ...e Point is properly connected to the back end Otherwise if the message shown is Registering CB in the CS failed then check following items Backend URL Case sensitive Check all the URL is correct Charg...

Страница 44: ...OCPP is to offer a uniform solution for the communication between Charge Point and a Central System With this open protocol it is possible to connect any Central System with any Charge Point regardle...

Страница 45: ...tab Public Address Manager establishes where the Charge Point must obtain the public IP address in order to send it later to the backend Different values can be selected in the Address Type section C...

Страница 46: ...ck on the Integrations tab choose the option selected under Available integrations according to your backend policies as shown in the picture NOTE Charge Point is working as stand alone if none option...

Страница 47: ...f the Charge Point does not have the license applied the following message pops up To obtain the license file please contact CIRCUTOR Post Sales Department More information in Need help chapter The li...

Страница 48: ...Wallbox ePark Instruction manual 48 A window will pop up in order to choose the file then click on upload...

Страница 49: ...ck on the link button as shown in the picture New tabs are opened to show OCPP Settings It can also be accessed directly typing http IP 8080 html setup html First time is running the integration selec...

Страница 50: ...struction manual 50 On the OCPP webpage go to Charge Box tab Check Charge Box Identity and the incoming ports according to the backend policies please contact to the Central System to get the configur...

Страница 51: ...ronization of date and time Disabled NOTE Date and Time is sent from backend on each heartbeat response Energy for Start Stop transaction PARTIAL Consumed value of energy by the vehicle sent between s...

Страница 52: ...e the central system is hosted to notify all the requests Check Central System URL according to the backend policies please contact to the Central System to get the configuration parameters Value Desc...

Страница 53: ...Wallbox ePark Instruction manual 53 Go to OCPP Settings tab Check OCPP Settings according to the backend policies please contact to the Central System to get the configuration parameters...

Страница 54: ...rized identifiers without waiting for the Central System authorization NO Charge Point requests authorization for presented identifiers to the Central System Allow offline Tx for unknown Id YES during...

Страница 55: ...den tifier in order to unlock the connector Supported profiles List of supported profiles on the Charge Point NOTE this field is for information purposes it cannot be modified Maximum number of config...

Страница 56: ...led NO Local Authorization List disabled Local auth list max length Maximum size of the Local Authorization List a list of identifiers that can be synchronized with the Central System It can be viewed...

Страница 57: ...cess appears then Charge Point is properly connected to the back end Otherwise if the message shown is Registering CB in the CS failed then check following items Backend URL Case sensitive Check all t...

Страница 58: ...HIGH consumption of data The IP address assigned previously is useful to connect with the Charge Point in order to monitor the real time status The main way to connect is using the PowerStudio client...

Страница 59: ...Wallbox ePark Instruction manual 59 Monitoring...

Страница 60: ...3 Type 2 Socket Type 2 Socket Type 2 Socket CEE 7 3 Min cable cross section 5 10 mm2 10 mm2 25 mm2 10 mm2 10 mm2 GENERAL DATA Display LCD Multi language Light beacon RGB Colour indicator RFID reader...

Страница 61: ...t this point pro tections with the same characteristics shall be placed upstream The CONNECTIVITY Ethernet 10 100BaseTX TCP IP Cellular 4 Modem 3G GPRS GSM Interface protocol OCPP 1 5 1 6 4 4 Dependin...

Страница 62: ...Wallbox ePark Instruction manual 62...

Страница 63: ...nits has been improperly used or the storage installation and maintenance instructions listed in this manual have not been fol lowed Improper usage is defined as any operating or storage condition con...

Страница 64: ...CIRCUTOR SA Vial Sant Jordi s n 08232 Viladecavalls Barcelona Tel 34 93 745 29 00 Fax 34 93 745 29 14 www circutor com central circutor com...

Отзывы: