![Circutor Raption 100 Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/circutor/raption-100/raption-100_installation-manual_2608159041.webp)
G
Verification
Once the entire installation procedure is completed, check the following points:
• Check that all the
MCB, RCD and the Main Circuit Breaker are powered on.
• Check that all safety labels are placed correctly.
• Close the Charge Point’s doors. The Charge Point has a security switch (antitamper
protection) installed that will avoid any charging session if the doors are opened.
• Check that all beacons are illuminated in green.
• Verify that each EV connector is in good condition.
• Make sure the ventilation air flow is correct and there is not any obstruction at the
ventilation grill. EVSE activates the Power module fan when charging and the roof fan
when temperature is above the limit. This is managed by Mode 4 control board.
• Check for abnormal noise while charging a vehicle.
F
How to use and configure it
In order to use and configure Charge Point there is an Instruction Manual that can be
downloaded from our website in the following link:
http://circutor.es/es/productos/recarga-inteligente-para-vehiculos-electricos/recarga-
exterior-de-vehiculos-electricos/serie-raption-detail#documentaci%C3%B3n
41
Installation Guide
Raption
Содержание Raption 100
Страница 1: ...Raption Series INSTALLATION GUIDE M186A01 03 21D...
Страница 2: ...2 Raption Installation Guide...
Страница 15: ...15 Installation Guide Raption...
Страница 16: ...3 A Dimensions Units specified in millimeters 16 Raption Installation Guide...
Страница 56: ...56 Raption Installation Guide...
Страница 58: ...58 Raption Installation Guide...
Страница 59: ...59 Installation Guide Raption...