![Circutor Raption 100 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/circutor/raption-100/raption-100_installation-manual_2608159014.webp)
All processes of unloading and handling of the Charge point must be executed and
monitored by qualified personnel attending to the significant weight of the unit,
complying with safety rules and using the appropriate points of support. Important
notes:
- The delivery truck only unloads the pallet carrying the Charge point
- The delivery truck does not have the lifting facilities to move the Charge point to its
final location
- The placement of the Charge point to its final location is the responsibility of the
contractor
Once the Charge point is already unloading from the truck, move it to its final location
with a fork lift.
F
Unloading and handling
14
Raption
Installation Guide
Содержание Raption 100
Страница 1: ...Raption Series INSTALLATION GUIDE M186A01 03 21D...
Страница 2: ...2 Raption Installation Guide...
Страница 15: ...15 Installation Guide Raption...
Страница 16: ...3 A Dimensions Units specified in millimeters 16 Raption Installation Guide...
Страница 56: ...56 Raption Installation Guide...
Страница 58: ...58 Raption Installation Guide...
Страница 59: ...59 Installation Guide Raption...