Contracted power
Number of relays
The delay in the connection
Type of connection / disconnection of the relays)
cyclical
linear,
Transient time
Power
Security failure
Yes
No
Configuration enables
No
Yes
We introduce the value of the contracted maximum demand with the utility
(in kW)
We select the number of relays that we will use.
Specify the delay that there will be between the time in which the alarm
disappears and the time in which the relay is connected again (in seconds).
We can select among the two different types of connection / disconnection.
-
, where we disconnect first the relays that have been
connected for a longer time
-
where the connection and disconnection is made by
priorities. ( the relay 1 is the first one to be disconnected).
Depending on the load on the installation, we can have transient quick
variations on the power (for example installations with a lot of inductive load)
but which should not cause an inmediate action by the controller. By means
of the transient time, we can adjust the response time of the controller to the
characteristics of the installation.( in seconds).
For each of the relays, we introduce the power that each of the relays
controls (in kW).
We can choose over here between a normally close relay (
) or normally
open (
).
Programmed in (
) it disables the modification of the previous parameters,
and in (
) it enables the modification of them.
Forecast control of the relays
Page 21
Chapter
3
Programming
Содержание DH96-CPP
Страница 16: ...Device configuration Page 16 Chapter 3 Programming...
Страница 18: ...Relays control by level Page 18 Chapter 3 Programming...
Страница 20: ...Forecast control of the relays Page 20 Chapter 3 Programming...
Страница 22: ...Notes Notes Page 22...