
139
Almost all the information appeared here,
‘EVSE’
tab, has been already explained in
the previous
‘AC-Mode 3’
tab. Next, we are going to explain the different options, as
susch as :
Lights; Reserved; Leakage; Emergency; Active energy; Partial active energy; Active power;
Voltage; Current; Charge request date.
Lights
Ligths status
Courtesy lights can be switched
on from here without touching
the screen
It switches off the courtesy lights
Reserved
Reserved status
It lets to activate the charging
session for one specific identifier
tag
It deactivates the option
Leakage/Shortcircuit
RCD/MCB status
Normal operation
The device has tripped
If for any reason, such as mainte-
nance work, and the RCD or MCB
has remote control, it is possible
to switch off
If the charge point is equipped with
RCD or MCB with remote control, it is
possible to reconnect pressing over
‘Reset’
Содержание Raption 50 Series
Страница 1: ...User Manual Raption 50 Series ...
Страница 2: ......
Страница 4: ......
Страница 12: ...08 Raption 50 Series User Manual C Dimensions Units specified in millimeters ...
Страница 17: ...13 ...
Страница 20: ...16 Raption 50 Series User Manual Next screen will appear press over your language s flag ...
Страница 40: ...36 Raption 50 Series User Manual 3 CONNECTOR DISABLE 4 CONNECTOR IN USE ...
Страница 41: ...37 5 CONNECTOR RESERVED 6 CONNECTOR BLOCKED PER RESERVED ...
Страница 42: ...38 Raption 50 Series User Manual 7 CONNECTOR BLOCKED PER CHARGING ...
Страница 75: ...71 ...
Страница 101: ...97 ...
Страница 118: ...114 Raption 50 Series User Manual A window will pop up in order to choose the file then click on upload ...
Страница 161: ...157 ...
Страница 166: ...162 Raption 50 Series User Manual 10 ...