109
D
Checkup
After applying new settings, please go to next URL from Charge Point in order to
check properly connection from the integration chosen:
http://
<
IP
>
/services/cpi/log?app=ocpp1.5
If
‘CB boot notification: success’
appears then Charge Point is properly connected
to the back-end.
Otherwise, if the message shown is
‘Registering CB in the CS: failed’
then check
following items:
- Backend URL. Case sensitive. Check all the URL is correct.
- Charge Point ID. Case sensitive. Check if the name entered is same as backend
expects to receive.
- Connectivity. Check if modem is power up and connected to the HMI screen. Ask
to the backend provider if any request has been received from the charge point
(BootNotification, StatusNotification or HeartBeat) after upgrading.
Look especially for the following messages:
Содержание Raption 50 Series
Страница 1: ...User Manual Raption 50 Series ...
Страница 2: ......
Страница 4: ......
Страница 12: ...08 Raption 50 Series User Manual C Dimensions Units specified in millimeters ...
Страница 17: ...13 ...
Страница 20: ...16 Raption 50 Series User Manual Next screen will appear press over your language s flag ...
Страница 40: ...36 Raption 50 Series User Manual 3 CONNECTOR DISABLE 4 CONNECTOR IN USE ...
Страница 41: ...37 5 CONNECTOR RESERVED 6 CONNECTOR BLOCKED PER RESERVED ...
Страница 42: ...38 Raption 50 Series User Manual 7 CONNECTOR BLOCKED PER CHARGING ...
Страница 75: ...71 ...
Страница 101: ...97 ...
Страница 118: ...114 Raption 50 Series User Manual A window will pop up in order to choose the file then click on upload ...
Страница 161: ...157 ...
Страница 166: ...162 Raption 50 Series User Manual 10 ...