background image

24

E

Wiring

Regardless of the electrical characteristics of the power line, be sure to supply to the 
Charge Point with the necessary electrical features indicated at the unit characteristics 
label, understood as, supply voltage, grid frequency and required apparent power. In 
the case that the power line characteristics are different from those required, must do 
the necessary adaptation of the same to meet this requirement.

The Charge Point has internal electrical protections in each socket-outlet for the 
protection of the user against an electrical failure, according to the international 
standard IEC 61851-1:2017. In order to guarantee the total protection of the users 
and the installation (power supply line included) in front of any electrical hazard, it is 
mandatory to install a main circuit breaker (MCB) and a residual current device (RCD) 
upstream of the charger. These electrical protections and the rest of the installation 
have to be aligned with the local and national rules and the selectivity of the protections 
has to be guaranteed at all times.

The proper earthing system must be 

TT or TN-S

. The ground loop impedance 

measurement for the entire installation must be less than 

80 ohms

. The earth 

resistance of the charging point could be less if required by national regulations. It 
is recommended to maintain these conditions over the years, therefore, technically 
competent personnel will carry out the verification of the installation of grounding, at 
least once a year, at the time when the terrain is drier.

Before starting wiring connection for the Charge Point, have to be checked the 
following important elements:

• 

After unpacking the Charge Point, ensure that all electrical components are in 
good condition.

• 

It is recommended to strictly follow the current regulations to determine the 
appropriate section of the power cables to feed the Charge Point and at any time 
as a minimum comply with indicated in the Technical Data here below.

• 

Make sure the switch (MCCB or fuses) from the main electrical panel from the 
installation are cutting the electricity supply during Charge Point installation.

• 

After the installation, you must seal all holes inside the Charge Point to prevent 
access of dirt, foreign objects, animals, etc.

Содержание Raption 150 Compact

Страница 1: ...Installation Manual Raption 150 Compact ...

Страница 2: ......

Страница 3: ...ns without the prior written permission of the original manufacturer Information provided in this manual is intended to be accurate and reliable However the original manufacturer assumes no responsibility for its use or for any infringements upon the rights of third parties that may result from its use All other product names or trademarks are properties of their respective owners CIRCONTROL reser...

Страница 4: ......

Страница 5: ...ns 05 D EVSE Classification 06 E Storage 07 F Unloading and handling 08 3 Dimensions and overview 09 A Dimensions 09 B Overview 10 4 Installation 11 A Minimum distances 11 B Foundation 12 C Opening 18 D Placing 20 E Wiring 24 F Verification 29 G How to use and configure 29 5 Technical data 31 6 Need help 33 Here s your guide to install Raption 150 Compact ...

Страница 6: ...CONTROL is not responsible for events arising from such breach ELECTRIC RISK This symbol indicates a potentially hazardous situation which if not avoided may result in a risk of fire serious injury or death The Charge Point must be disconnected from any power source before performing any maintenance repair or electrical manipulation inside ATTENTION Follow the instructions preceded by this symbol ...

Страница 7: ...tal communication between a DC EV charging station and an electric vehicle for control of DC charging Meets the CCS specification DIN 70121 ISO 15118 ready Directives 2014 53 EU Radio and Telecommunication Terminal equipment 2014 30 EU Electromagnetic Compatibility EMC 2014 35 EU Low Voltage directive RFID complies with ISO 14443A B MIFARE Classic DESFire EV1 ISO 18092 ECMA 340 NFC 13 56MHz Meter ...

Страница 8: ...sethisunitforanythingother thanelectricvehiclechargingmodes areexpectedinIEC61851 Donotmodifythisunit Ifmodified CIRCONTROLwillrejectall responsibilityandthewarrantywill bevoid Complystrictlywithelectricalsafety regulationsaccordingtoyourcountry Donotmakerepairsormanipulations withtheunitenergized Onlytrainedandqualifiedpersonnel shouldhaveaccessto theelectrical partsinsidetheChargePoint Checkthei...

Страница 9: ...n Note that various factors such as cable length between distribution board and the Charge Point maximum input current of the Charge Point the installation way may have influence of the selected cable In such cases increasing the cable cross section can be necessary The installation company will be responsible for dimensioning the wires cross section and the electrical protections taking into acco...

Страница 10: ...equipment with non conducting handles when working on electrical devices Never use metallic pencils or rulers or wear rings or metal watchbands when working with electrical equipment Enclose all electric contacts and conductors so that no one can accidentally come into contact When it is necessary to handle equipment that is plugged in be sure hands are dry and when possible wear nonconductive glo...

Страница 11: ...Permanently connected 2 Power supply Output DC EV supply equipment 3 Environmental conditions Indoor and outdoor 4 Access Equipment for locations with restricted access and Equipment for locations with non restricted access 5 Mounting method Stationary equipment Ground mounted floor mounted 6 Protection against electric shock Class I 7 Charging models Mode 4 ...

Страница 12: ...cted against negative elements such as heat radiation direct solar radiation mechanical damage organic dissolvent impacts etc Temperature for temperatures below 20 ºC and over 60º C special attention must be paid to the storage and handling Environment Charge Point must be stored in a dry and dust free location The distance from a heat source must be 1 m away Outdoor storage of the unit has to be ...

Страница 13: ...ts of support Important notes The delivery truck only unloads the pallet carrying the Charge Point The delivery truck does not have the lifting facilities to move the Charge Point to its final location The placement of the Charge Point to its final location is the responsibility of the contractor Once the Charge Point is already unloaded from the truck move it to its final location with a forklift...

Страница 14: ...09 Raption 150 Compact Installation Manual 3 A Dimensions Units specified in millimeters 1290 1140 1910 550 610 460 ...

Страница 15: ...ayment 8 Touch screen 9 Air inlet Unit 10 CHAdeMO light beacon 11 CHAdeMO holder 12 CHAdeMO connector 13 Power M air inlet 14 Decorative rear panel 15 4G Antenna 16 Courtesy light 17 Exit cable 18 Emergency button 19 Decorative front panel 1 3 2 5 6 4 10 12 8 11 13 14 9 19 17 16 15 Depending on the model the components can vary 7 18 ...

Страница 16: ... it should be installed Do not install near areas where water or fluids can penetrate into the unit Do not install the Charge Point on unstable terrain Respect the minimum lateral distance to allow proper circulation of air flow This unit has forced ventilation If Bollard Impact Protector is installed keep 900 mm as a minimum distance in order to give enough space to open the frontal door of the C...

Страница 17: ...s chapter is the technical definition and basic requirements for implementing the base and fixing the Charge Point The unit is adequate for indoor and outdoor installation A foundation kit with a mounting template is provided to ensure the distances between the foundation bolts Washers M16 6x 1x Template lower part ...

Страница 18: ...13 Raption 150 Compact Installation Manual TEMPLATE UPPER PART DIMENSIONS ...

Страница 19: ...441 551 945 4 481 3 476 1 5 XXXXXXX 1 XXXXXXX 2 Nº FECHA DESCRIPCIÓN DIBUJADO APROBADO MODIFICACIONES D E F C B A 3 2 1 5 C D 4 6 7 8 A B C López 18 01 2022 Acero galvanizado 1 219 Kg MEDIDAS EN mm TOLERANCIAS GENERALES PIEZAS METÁLICAS S DIN 2768 m PIEZAS PLÁSTICAS S DIN 16742 PESO F CIRCONTROL S A ACABADO MATERIAL DIBUJADO COMPROBADO FECHA NOMBRE Nº PLANO DENOMINACION ESCALA E REV ...

Страница 20: ...aption 150 Compact Installation Manual Place the foundation bolts into the templates using provided nuts with the help of a 24mm open end wrench Take into consideration the following measures Step 1 Step 2 ...

Страница 21: ... of depth is recommended to make a concrete base The concrete base shall provide the passage of power cables it must be done by corrugated tube placed inside the foundation through the mounting template Before fixing the template inside of the concrete basement make sure front mark must face with the front side of the charger 160 5 250 ...

Страница 22: ...pactors VERY COMPACT 20 130 x 60 x 45 For example mix sand ground with very compacted and paved gravel asphalt VERY COMPACT AND CONCRETE SLAB 20 130 x 60 x 40 Minimum slab edge 10cm of concrete HM 100 Note In the event of any doubt about the terrain regarding the installation of the Charge Point due to the weight and dimensions it will be necessary to define a final solution to install the unit It...

Страница 23: ...18 C Opening Steps 1 Insert the key supplied in the lock and turn it 90 counterclockwise 2 Pull back the handle 3 Turn the handle 90 clockwise direction Step 2 Step 3 Left door Step 1 ...

Страница 24: ...19 Raption 150 Compact Installation Manual Right door Steps 1 Push on the round metallic button placed behind to the mechanic lock On the top and the bottom part of the Right door Step 1 ...

Страница 25: ... 2 Once the Decorative front panel is removed locate the screws that are fixing the pallet Remove the screws with a 19 mm spanner tool Step 1 Step 2 In order to place the Charge Point in its final location please follow the next steps The Charge Point is mounted on a pallet so as to do a safe transport It has to be removed before to installation ...

Страница 26: ...N Once the Charge Point is free from the pallet there are two options to move it to the final location a Move the Charge Point with eyebolts Steps 1 Remove totally the stoppers from the top of the Charge Point 2 Locate and make sure that the eyebolts provided are strongly tight Step 1 Step 2 ...

Страница 27: ... up and placed on the final location 4 Screw the 4 x M16 nuts with washers on the threaded rods already installed on the base on both sides place again the unit cover 5 Remove the eyebolts from the Charge Point and put the stoppers in that place Step 3 Step 4 Step 5 ...

Страница 28: ...ll be available enough space to introduce the forklift 560 mm Step 1 Step 2 Steps 1 Remove the decorative rear panel Pull outward the metal flange on both sides 2 Move out the metal flange on both sides and remove the decorative rear panel Once Charge Point installation has been finished remember to install the Allen screws included in the decorative panel ...

Страница 29: ...tections has to be guaranteed at all times The proper earthing system must be TT or TN S The ground loop impedance measurement for the entire installation must be less than 80 ohms The earth resistance of the charging point could be less if required by national regulations It is recommended to maintain these conditions over the years therefore technically competent personnel will carry out the ver...

Страница 30: ...nds not supplied In order to make a secure cable installation it is necessary to use the metal plate provided In the case of not using this metal plate and any damage to internal components arises due to the entry of dirt animals or any other external element Circontrol will reject any warranty claim against the unit Step 1 Step 2 Note To ensure IP54 enclosure rating it is needed to use foam insul...

Страница 31: ...26 Power input connection Connecting cable OPTION A Charge Point must be supplied with 1 Three phases Neutral 400V 50Hz 2 Earth cable ...

Страница 32: ...Power input connection Connecting cable OPTION B Eliminate orange cables L1 230V 50Hz 400V 50Hz III PE Charge Point must be supplied with 1 Three phase power source Three phases Neutral 400V 50Hz Earth cable 2 Single phase power source 230V 50Hz ...

Страница 33: ...per cables with three loaded conduc tors for installations in conduit in a thermally insulated wall A2 method according to IEC 60364 5 52 The final cross section might be different if the installation method is another one in any case it has to be calculated by the installer taking into account the cable materials the conditions of installation and distances 300 mm2 is the maximum cable cross sect...

Страница 34: ...owing points Complete the Commissioning checklist Check that all the MCB RCD Main Circuit Breaker and Disconnectors are powered on Check that all safety labels are correctly placed Close the Charge Point s doors The Charge Point has a security switch anti tamper protection installed that will avoid any charging session if the doors are opened Check that all beacons are illuminated in green Verify ...

Страница 35: ...30 ...

Страница 36: ...col OCPP 1 5 or OCPP 1 6J SM Compliance CE Combo 2 DIN 70121 ISO15118 IEC 61851 1 IEC 61851 23 IEC 61851 21 2 CHAdeMO compatible Enclosure rating IP54 IK10 Enclosure material Stainless steel Operating temperature 30 ºC to 50 ºC Ambient temperature storage 40 ºC to 60 ºC Operating humidity 5 to 95 Non condensing Socket protection Locking System RFID system ISO IEC14443 1 2 3 MIFARE Classic Display ...

Страница 37: ...3 1 class II Cable Length 5 5 meters all cables Anti vandal connector protection CHAdeMO CCS mechanical connector locking Network hub Switch TCP ethernet 8 ports Switch TCP ethernet 12 ports RFID Extension Legic Advant Legic Prime ISO 15693 ISO 18092 Sony FeliCa Contacless payment Integrated credit card payment terminal Models Specifications Raption 150 Compact Models CCS CCS CHA CCS CCS Maximum o...

Страница 38: ...33 Raption 150 Compact Installation Manual 6 ...

Страница 39: ...34 Need help In case of any query or need further information please contact our Post Sales Department 34 937 362 940 34 937 362 941 support circontrol com circontrol com ...

Страница 40: ...ONTROL Raption 150 Compact INSTALLATION MANUAL A comprehensive guide on how to install and verify your Raption 150 Compact Charging Station V1 0 January edition 2022 CIRCONTROL S A ALL RIGHTS RESERVED R484 ...

Отзывы: