
16
•
Once the kit is assembled, it must be placed in the ground. If the Charge Point has
to be installed outside and there is no limitation of depth, is recommended to make
a concrete base.
•
The concrete base shall provide the passage of power cables, it must be done by
corrugated tube placed inside the foundation through the mounting template.
Before fixing the template inside of the concrete basement make
sure front mark must face with the front side of the charger
160,5
250
Содержание Raption 150 Compact
Страница 1: ...Installation Manual Raption 150 Compact ...
Страница 2: ......
Страница 4: ......
Страница 18: ...13 Raption 150 Compact Installation Manual TEMPLATE UPPER PART DIMENSIONS ...
Страница 35: ...30 ...
Страница 38: ...33 Raption 150 Compact Installation Manual 6 ...