![CIP UNIGAS HP60 Series Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/cip-unigas/hp60-series/hp60-series_manual-of-installation-use-maintenance_2607671027.webp)
M039150CF
27
BERGONZO
NOZZLE DIAGRAMS
Fig. 23
Example (Bergonzo):
if a 220kg/h flow rate BERGONZO nozzle is provided, set the return pressure at 11bar, supply at 20bar on the
delivery to get a 220kg/h flow rate. If the return pressure needed is 5bar, instead, act on the
V
adjusting screw on the pressure gover-
nor. The flow rate will then be about 95kg/h (see the example showed on the Bergonzo diagram).