Cinier Greenor Скачать руководство пользователя страница 6

5 - Electrical connection of the rough

WARNING : ELECTRIC SHOCK HAZARD CAN CAUSE INJURY OR DEATH. BEFORE ATTEMPTING
TO  INSTALL  THE  UNIT,  TURN  OFF  THE  POWER  AND  DISCONNECT  ALL  POWER  SUPPLY
CIRCUITS. 

Only a LICENSED CONTRACTOR may open the fan coil. 

Connect  the  power  supply  cable  2+PE  to  the  plug  provided  in  accordance  with  current  legislation  and  local
building codes. 
Greenor is to be connected to a 

230

V/

5

0Hz grounded power supply line.

(Drawing No 4)
Cable must not overhang from its protective ducting to prevent potential pinching by the front panel of the unit.
Make sure that power supply can be disconnected across all contacts.

Screw the cover back on

B

lue

 

Neutr

al

 N 

N (

on the right

Phase L 

L (

on the right

Brown or black

Ground

 (

on the right)

Neutr

al

 N 

1 (

on the left

Phase L 

2 (

on the right

Ground

Electrical connections for «heating only» version

  Color of wire 

Denomination 

Clamp

Green-yellow

 

Remove shunt clamp 3/4

Electrical  connections  for  «reversible»  version

  Color of wire 

Denomination 

Clamp

B

lue

 

Brown or black

Green-yellow

 

(

on the left

Picture No 4

 : Connection scheme for electric connection

Содержание Greenor

Страница 1: ...ty does not cover any damage arising from improper installation improper maintenance improper storage or handling Remove the Greenor fan coil from its box and separate the front panel from the rough c...

Страница 2: ...oil Use clean hands or clean thin rubber gloves to handle the panel Greenor fan coil must have at least a 6 15cm clearance on each side of the panel floor ceiling wall and at least 20 50cm in front of...

Страница 3: ...e in reversible mode To use with a reversible heat pump on a closed water circuit with a maximal service pressure 101 5 PSI 7bars and a maximal water temperature of 167 F 75 C and minimal water temper...

Страница 4: ...equate wall plugs and screws designed for the bearing wall The unit must be handled by two persons You may use an adapted lifting device Front View Rough Chassis Frontview Olycal Stone Frontplate 3 4...

Страница 5: ...he gaskets and flexible hoses Connect the condensate line to the waste pipe use a condensate draining lifting pump when necessary Mounting of draining lifting pump Place the support of the pump using...

Страница 6: ...Cable must not overhang from its protective ducting to prevent potential pinching by the front panel of the unit Make sure that power supply can be disconnected across all contacts Screw the cover bac...

Страница 7: ...perate the fan coil unit to check that all the fans function properly at the 3 operating speeds Check also that the opening of the thermal bypass valve opens correctly Once all these parameters have b...

Страница 8: ...regularly with a sweeper The panel can be cleaned with a slightly humid soft cloth or sponge with warm water and soap or a mild dish detergent Do not use abrasive or alkaline products Remove stains im...

Страница 9: ...eport N 2300800CDG 001 controlled by INTERTEK Laboratory inc CSA C22 2 No 236 issue 2011 10 14 Ed 4 Heating and Cooling Equipment report N 2300800CDG 001 controlled by INTERTEK Laboratory inc CEM elec...

Отзывы: