To operate in heating system only mode
To operate with a conventional boiler on a closed 
hot  water  circuit  with  a  maximal  service-pressure 
101.5 PSI/7bars and a maximal water temperature 
of 167°F / 75°C.

g system 

Getting ready to connect the heatin

only 

(drawing No 1) 

Prepare  the  supply  and  return  water  inlets 
(elbow fittings males 1/2

"

 flat gasket); Respect the inlet /outlet flow as per drawing.

Prepare the  power  cable  as  shown  on 
drawing  No 1.
The  power  supply  cable  should  project  out  of the wall by about 11

"

/ 30cm.

Drawing No 1 - 

Details of hydronic connections

Greenor

®  

R

REVERSIBLE HEATING AND COOLING SYSTEM

To operate in reversible mode
To  use  with  a  reversible  heat  pump  on  a  closed 
water circuit with a maximal service pressure 101.5 
PSI  /  7bars  and  a  maximal  water  temperature  of 
167°F  /  75°C  and  minimal  water  temperature  of 
44.6°F/ 7°C

Getting  ready  to  connect  the  reversible  system 
(drawing No 2)
Prepare the supply and return water inlets 
(elbow fittings males 1/2

"

 flat gasket); Respect the 

inlet /outlet flow as per drawing.

Prepare the power cable as shown on drawing No 2.
The  power  supply  cable  should  project out  of the wall by about 11

"

/ 30cm.

Besides,  it  is  necessary  to  plan  drainage  of condensate  using  a  drain  and  an 
indirect  waste pipe,  to  dispose  of  condensate  into  the  waste water circuit.

An optional pump is available, in that case plan a 
pipe  0.24

"

x0.31

"

/  6x8mm  with  a  length  of  about 

1

"

/ 30mm for the evacuation.

Drawing No 2 - 

Details of hydronic connections

Содержание Greenor

Страница 1: ...ty does not cover any damage arising from improper installation improper maintenance improper storage or handling Remove the Greenor fan coil from its box and separate the front panel from the rough c...

Страница 2: ...oil Use clean hands or clean thin rubber gloves to handle the panel Greenor fan coil must have at least a 6 15cm clearance on each side of the panel floor ceiling wall and at least 20 50cm in front of...

Страница 3: ...e in reversible mode To use with a reversible heat pump on a closed water circuit with a maximal service pressure 101 5 PSI 7bars and a maximal water temperature of 167 F 75 C and minimal water temper...

Страница 4: ...equate wall plugs and screws designed for the bearing wall The unit must be handled by two persons You may use an adapted lifting device Front View Rough Chassis Frontview Olycal Stone Frontplate 3 4...

Страница 5: ...he gaskets and flexible hoses Connect the condensate line to the waste pipe use a condensate draining lifting pump when necessary Mounting of draining lifting pump Place the support of the pump using...

Страница 6: ...Cable must not overhang from its protective ducting to prevent potential pinching by the front panel of the unit Make sure that power supply can be disconnected across all contacts Screw the cover bac...

Страница 7: ...perate the fan coil unit to check that all the fans function properly at the 3 operating speeds Check also that the opening of the thermal bypass valve opens correctly Once all these parameters have b...

Страница 8: ...regularly with a sweeper The panel can be cleaned with a slightly humid soft cloth or sponge with warm water and soap or a mild dish detergent Do not use abrasive or alkaline products Remove stains im...

Страница 9: ...eport N 2300800CDG 001 controlled by INTERTEK Laboratory inc CSA C22 2 No 236 issue 2011 10 14 Ed 4 Heating and Cooling Equipment report N 2300800CDG 001 controlled by INTERTEK Laboratory inc CEM elec...

Отзывы: