Cinier Greenor Скачать руководство пользователя страница 2

1- Receiving:

Standard delivery content:

- The 

Greenor

®

 fan coil comes

plastic-wrapped and in a heavy-duty card-
board box on a pallet.
A template is included for optimal ease of 
installation.

- With the fan coil: two extensible flexible

hoses to connect to the heating system.

- 4 air f 1 remote control.
- One cleaning accessory to attach to

the vacuum cleaner for routine cleaning.

Equipment and tools required for installation:

- Raw-plugs, screws and washers selected to hold the weight of the fan coil on the supporting wall 

(134.5 lbs / 61 kg)

- Standard fixing and connection tools (elbow fitting 90° male 1/2», flat gaskets...).

Handling and positioning:

(The fan coil must be handled by two persons.)
Use thin rubber gloves to handle the 

Greenor

®

 fan coil.

Use clean hands or clean thin rubber gloves to handle the panel.

Greenor

®

 fan coil must have at least a 6»/15cm clearance on each side of the panel (floor, ceiling, wall) and at 

least 20»/50cm in front of the panel.
When positioning the unit, make sure that the air intakes are free from obstructions and far enough from potential 
hazards such as curtains.

2 - Preparation:

Removal of the front panel
Remove the 2 clamp-locking screws, 
Open both bottom clamps, 
Raise the lower section and the 4 filters slightly, 
Disengage with a small upward movement.

Before drilling, use the template provided to mark the location of the four fixing holes at the top of the unit and 
of the one fixing hole by the bypass valve.
The contractor will decide on the best fixation system to bear the 134,5lbs/61kg weight fan coil.
Secure the rough chassis with adequate wall plugs and screws designed for the bearing wall.
The unit must be handled by two persons.

Содержание Greenor

Страница 1: ...ty does not cover any damage arising from improper installation improper maintenance improper storage or handling Remove the Greenor fan coil from its box and separate the front panel from the rough c...

Страница 2: ...oil Use clean hands or clean thin rubber gloves to handle the panel Greenor fan coil must have at least a 6 15cm clearance on each side of the panel floor ceiling wall and at least 20 50cm in front of...

Страница 3: ...e in reversible mode To use with a reversible heat pump on a closed water circuit with a maximal service pressure 101 5 PSI 7bars and a maximal water temperature of 167 F 75 C and minimal water temper...

Страница 4: ...equate wall plugs and screws designed for the bearing wall The unit must be handled by two persons You may use an adapted lifting device Front View Rough Chassis Frontview Olycal Stone Frontplate 3 4...

Страница 5: ...he gaskets and flexible hoses Connect the condensate line to the waste pipe use a condensate draining lifting pump when necessary Mounting of draining lifting pump Place the support of the pump using...

Страница 6: ...Cable must not overhang from its protective ducting to prevent potential pinching by the front panel of the unit Make sure that power supply can be disconnected across all contacts Screw the cover bac...

Страница 7: ...perate the fan coil unit to check that all the fans function properly at the 3 operating speeds Check also that the opening of the thermal bypass valve opens correctly Once all these parameters have b...

Страница 8: ...regularly with a sweeper The panel can be cleaned with a slightly humid soft cloth or sponge with warm water and soap or a mild dish detergent Do not use abrasive or alkaline products Remove stains im...

Страница 9: ...eport N 2300800CDG 001 controlled by INTERTEK Laboratory inc CSA C22 2 No 236 issue 2011 10 14 Ed 4 Heating and Cooling Equipment report N 2300800CDG 001 controlled by INTERTEK Laboratory inc CEM elec...

Отзывы: