14
Fi gur e 21
Fi gur e 22
Mar k
C
4.
To Ensure a Smooth and Successful Installation, You Should:
1) Have electrical work to comply with latest national electrical code, national fire code,
and all applicable local codes and ordinances.
2) Coordinate with other trades to avoid interference.
3) Verify existing conditions on the site and coordinate with owner side to ensure
necessary utilities available.
4) Copy all related plans, specifications, shop drawings and attachments to schedule and
coordinate related work.
5) Thoroughly review the project to ensure that all jobs should meet or exceed the above
requirements. Contact with the CCTV Project Coordinator to draw attention in case
alleged discrepancies occur.
VI. Technical data table
Image Inductor
1/4
″
C
olor CCD
Pixels
752 H
×
582 V
(
440000 pixels
)
PAL
In-Phase System
In-Phase Inside
Video Output
1.0 Vp-p/75
Ω
White Balance
Auto / Manual
Power Supply
AC 24V
±
10% 1.25A (with fan/heater)
30 VA (with fan/heater)
Power Consumption
15 VA (indoor)
2 Kg
Weight
4 Kg (with
aluminum alloy ball
)
Installation
Indoor ceiling installation or wall
mounting
Opposite
Humidity
10-75 %
Specifications
Environment
Temperature 0
℃
~40
℃
Scan System
15.625 KHz (H) 50Hz (V)
Horizontal 480
Horizontal
Signal-to-Noise
> 48 db
Shutter
1/3
~
1/10000 sec
Camera
Function
Sensitivity
0.01
~
1 lux (F1.6)
Lens
Zoom Rate
18
×
Optical and 12
×
Digital