13
Bolt M10x45 (59), M10 Nylon Nut (71), and
φ
11 Washers (68-2pcs).
4) Draw the Cable A (48) around the Pulley (30) on the Double Floating Pulley Bracket
(25) then pull it up towards to the opening on the Upper Frame (6).
Attach two Pulleys (30) to the Upper Frame (6) with Hexagon Head Bolts M10x45
(59-2pcs), M10 Nylon Nuts (71), and
φ
11 Washers (68-4pcs).
5) Draw the Cable A (48) around these two Pulleys (30) on the Upper Frame (6) then
pull the Cable A (48) downwards to the Weight Pick Up Pole (15). Thread the bolt at
the end of the Cable into the opening on top of the Weight Pick Up Pole (15) to
secure the Cable.
6) Attach the C-Clip (52) to the Cable A (48) by using a Chain(52). Attach the Lat Bar
(18) to the Chain (47) by using another C-Clip (52). Adjust the Chain (47) to the
desired length.
INSTALL THE CABLE B(49)
1) Attach the CableB (49) to the open bracket on the bottom of the Leg Developer (5).
Note: The Ball Stopper on the cable should be underneath the Pulley (30).
Attach the Pulley (30) to the Leg Developer (5) with Hexagon Head Bolt M10x60 (59),
M10 Nylon Nut (71), and
φ
11 Washers (68-2pcs).
2) Draw the Cable B (49) underneath the Pulley (30) to the open bracket on the Main
Support Tube (3).
Attach the Pulley (30) to the Main Support Tube (3) with Hexagon Head Bolt M10x45
(59), M10 Nylon Nut (71), and
φ
11Washers (68-2pcs).
3)Pull the CableB (49) up to the open bracket on the Crossed Double Floating Pulley
Bracket (26).
Attach the Pulley (30) to the Crossed Double Floating Pulley Bracket (26) with
Hexagon Head Bolt M10x45(59), M10 Nylon Nut (71), and
φ
11 Washers (68-2pcs).
4) Draw the Cable B around the Pulley (30) on the Crossed Double Floating Pulley
Bracket (26) to the open bracket on the Base Tube (1).
Attach the Pulley (30) to the Base Tube (1) with Hexagon Head Bolt M10x45 (59), M10
Nylon Nut (71), and
φ
11 Washers (68-2pcs).
5) Draw the Cable B(49) around the Pulley (30) on the Base Tube (1) and then pull it up
towards to the open bracket on the Double Floating Pulley Bracket (25).
Attach one Pulley (30) to the Double Floating Pulley Bracket (25) with Hexagon Head
Bolt M10x45 (59), M10 Nylon Nut (71), and
φ
11Washers (68-2pcs).
6)Draw the CableB (49) around the Pulley (30) on the Double Floating Pulley Bracket
(25) and then pull it downwards to the triangle plate on the Base Tube (1).
Connect the Cable B (49) to the C-Clip (52) then connect on the Base Tube (1) with
Cable B (49) and one end of Chain (47). Connect the C-Clip (52) to the other end of
Содержание CD-2006A
Страница 4: ...3 OVERVIEW DRAWING...