3. Remove the 11 screws securing the HKBA board.
4. Pull back the harnesses and pull out the board.
5. Replace the board.
6. To re-install, follow these steps in reverse order.
Replacing the status LED board (SLB)
The status LED board (SLB) provides a visual about the operational state of the projector.
Estimated replacement time: 2 minutes
1. Remove the rear cover (on page 35).
2. Remove the two screws securing the board.
3. Disconnect the harness and pull out the board.
4. Replace the board.
5. To re-install, follow these steps in reverse order.
Printed circuit boards and sensors
Boxer 4K Service Guide
106
020-101699-04 Rev. 1 (02-2018)
Copyright
©
2018 Christie Digital Systems USA, Inc. All rights reserved.
Содержание Boxer 30
Страница 1: ...Service Guide 020 101699 04 Boxer 4K...
Страница 113: ......