Operation
Pos : 165 /200 Chris t/360 GT-BA Labor-Pil ot ( STAND ARDMO DULE)/060 Betrieb/060-0011 Ers te I nbetriebnahm e Epsil on ++++++++++++++++++++++++++ @ 36 \mod_1436509116118_68. docx @ 267286 @ 2 @ 1
6.1
Initial start-up
WARNING
Risk of injury caused by consequences of transport damage, or
improper connections (e.g. escaping media).
Leaks after the transport, set-up, and connection of the freeze-dryer may
lead to problems, e.g. the escape of media (depending on the
configuration of the freeze-dryer, e.g. refrigerant, heat transfer medium,
hydraulic oil, nitrogen, hydrogen peroxide, etc.), at a later time during the
initial start-up of the freeze-dryer.
This may lead to severe damage to health or even life-threatening injuries.
• Prior to the initial start-up of the freeze-dryer, all of the supply and
disposal connections must be checked for leaks by specialised
persons.
Pos : 166 /010 Univ ers almodul e/ Leerz eile @ 0\mod_1202116244500_0.docx @ 114 @ @ 1
Pos : 167 /200 Chris t/360 GT-BA Labor-Pil ot ( STAND ARDMO DULE)/060 Betrieb/060-0020 I nst allation v on Z ubehörk omponent en++++++++++++++++++++++ @ 25\m od_1404983761840_68. docx @ 183607 @ 2 @ 1
→
6.2
Installation of accessories
The accessories must be completed in accordance with the drying method
that is applied as well as in accordance with the scope of supply.
Pos : 168 /010 Univ ers almodul e/ Leerz eile @ 0\mod_1202116244500_0.docx @ 114 @ @ 1
Pos : 169 /200 Chris t/360 GT-BA Labor-Pil ot ( STAND ARDMO DULE)/060 Betrieb/060-0030 Vor ber eitung der Gefriertr ocknungsanlag e +++++++++++++++++++++++++++++++++ @ 25\m od_1404983762863_68. docx @ 183620 @ 2 @ 1
6.3
Preparation
The ice condenser chamber must be clean and dry.
• Remove any water residues from the preceding run.
• Close the aeration valve and the media drain valve.
• Ensure that all of the valves of the accessories are closed.
• Switch the vacuum pump on.
Pos : 170 /010 Univ ers almodul e/ Leerz eile @ 0\mod_1202116244500_0.docx @ 114 @ @ 1
Pos : 171 /200 Chris t/360 GT-BA Labor-Pil ot ( STAND ARDMO DULE)/060 Betrieb/060-0040 Ei nsc halten (H aupt- und Steuer ungss chalt er) ++++++++++++++++++++++++++++++++++++++ @ 25\m od_1404983763907_68. docx @ 183634 @ 2 @ 1
6.4
Switching the freeze-dryer on
NOTE
The freeze-dryer is equipped with a main switch and a control switch (see
chapter 2.1.1 - "Functional and operating elements"). The main switch
establishes the mains power supply and the control switch supplies the
control system of the freeze-dryer with power.
• Actuate the main switch.
• Actuate the control switch.
The LSCplus control unit performs a self-test and an initialisation. This may
take several seconds.
• Follow the safety instructions and hazard warnings (see chapter 3 -
Pos : 172 /010 Univ ers almodul e/ Seit enwechs el @ 0\mod_1202116244312_0.docx @ 105 @ @ 1