Freeze-dryer Epsilon 2-6D LSCplus
Index
154 / 156
Version 07/2022, Rev. 3.0 of 20/07/2022
• sb
Translation of the original operating manual
LPCplus SCADA System ......................... 107
LSCplus control system ............................. 58
Lyes ........................................................... 40
LyoBalance weighing system ............. 63, 108
LyoCam monitoring camera system ......... 107
LyoCoN Controlled Nucleation ................. 106
LyoControl measuring system .................. 107
LyoControl-Rx ............................................ 93
LyoLogplus data logging software ............ 107
M
Main drying ................................................ 23
Main switch (line disconnector) .................. 38
Main window "?" ......................................... 88
Main window "Manual" ............................... 59
Main window "Options" .............................. 73
Main window "Program" ............................. 72
Mains voltage ........................................... 141
Maintenance .................................. 40, 84, 87
Maintenance (electrical system) ............... 121
Maintenance (general tasks) .................... 116
Maintenance (heat transfer medium system)
............................................................. 124
Maintenance (refrigeration system) .......... 124
Maintenance (vacuum sensor) ................. 125
Maintenance (vacuum system) ........ 122, 123
Maintenance and service ......................... 116
Maintenance performed by the user ......... 116
Maintenance schedule (dry-running vacuum
pump) ................................................... 132
Maintenance schedule (oil-sealed vacuum
pump) ................................................... 127
Malfunction of the pressure control valve . 113
Malfunctions ............................................. 110
Manual freeze-drying ................................. 88
Manufacturer ..................... 116, 126, 139, 140
Manufacturer contact data ......................... 88
Marking of the unit ..................................... 25
Materials of construction, damage ........... 116
Mathematical relations ............................. 142
Max. humidity ........................................... 141
Measures to be taken to ensure safe
operation ................................................ 41
Media drain valve ....................................... 49
Media drain valve, cleaning and care ....... 120
Media drain valve, malfunction ................. 113
Mode of operation ...................................... 20
Monitoring camera system LyoCam ......... 107
N
Name plate .......................................... 19, 48
Network ..................................................... 78
Network drive ............................................. 60
New program ............................................. 72
Nitrogen (hazards) ..................................... 33
No indication on the display ..................... 110
Noise (hazards) ......................................... 36
Noise level ............................................... 140
Noise measurement ................................... 27
Nominal current ....................................... 141
Nominal voltage ......................................... 19
Notes on safety and hazards ....................... 9
O
Oil mist separator (exhaust filter) and vacuum
pump (oil-sealed) .................................... 50
On-site transport ........................................ 45
Operating elements .................................... 14
Operating hours ......................................... 84
Operating mode: select/start ...................... 66
Operating personnel .................................. 27
Operating status ........................................ 60
Operating voltage....................................... 48
Operation ................................................... 41
Operational safety .................................... 125
Operator (responsibility) ............................. 27
Option: Aeration, stoppering, storage ....... 100
Option: Comparative pressure measurement
....................................................... 99, 107
Option: Controlled Nucleation LyoCoN ..... 106
Option: Improved cooling rate (fast freezing)
............................................................. 106
Option: LAN process recording (RJ45) ..... 107
Option: LPCplus SCADA System ............. 107
Option: LyoBalance weighing system . 63, 108
Option: LyoCam monitoring camera system
............................................................. 107
Option: LyoControl measuring system ..... 107
Option: LyoLogplus data logging software 107
Option: Pressure increase test ..... 62, 97, 106
Option: USB process recording .......... 62, 108
Option: Weighing system ......................... 100