Freeze-dryer Epsilon 2-10D LSCplus
8 Maintenance and service
132 / 161
Version 07/2022, Rev. 3.0 of 20/07/2022
• sb
Translation of the original operating manual
System/
Component
Detail / Part
Inspection
Periodical Maintenance
Repair / Rebuild
Be
fo
re
s
ta
rt
Pe
r wo
rk
in
g
d
a
y
In
s
p
e
c
ti
o
n
Rep
la
c
e
m
e
n
t
O
p
e
ra
ti
o
n
Cal
ib
ra
ti
o
n
Water content of
heat transfer medium
X
Test sample (visual
inspection, freezing
point, boiling point)
Heat exchanger:
corrision
X
5 years
Replace insulation
(Armaflex) at heat
exchanger and
remove corrosion
Hydraulic
system
Mechanical
components:
operation
X
Leakages
X
X
Maximum pressure
reading
X
Oil in reservoir
X
Hydraulic hose lines:
condition
X
5 years
Replace hose lines
even if no safety-
relevant defects can
be noticed
Cylinder: travel
speed
X
Instrumentation
Vacuum sensor(s)
X
Calibration
Temperature sensors
at freeze-dryer
X
Calibration
Pressure sensors
chamber
X
Calibration
Product temperature
sensors
X
X
Calibration,
replacement of
connectors
Level switch(es)
X
Pilot valves
(Solenoid valves)
X
X
Electrical
installation
Switch cabinet:
temperature inside
X
X
Infrared readings if
possible
Switch cabinet:
condition of the
components
X