Chapter 3 Operation
CMN004-005
45
E
nglis
h
3.1.2 Wiring and Piping
■
Wiring
WARNING
• Perform wiring firmly, without bending or pulling cables with excessive force.
Fire or electric shock may result.
• Ensure that the power supply conforms to the specifications of the device.
• Be sure to connect the ground wire.
CAUTION
• Avoid multiple connections as they can cause voltage reduction.
At reduced voltage, the device may fail to operate normally, resulting in
failure.
The device is powered by a single-phase supply.
The tolerance of the supply voltage is
10%.
1.
Connect the device attachment plug of the power cord to the power connector on the device.
2.
Connect the power supply end of the power cord to the power outlet.
■
Piping
1.
Turn the removable flange clockwise until it is
secured on the suction port.
2.
Connect the suction tube (to be prepared
separately) to the removable flange.
3.2 Operation
1.
Turn on the main power switch.
The display indicates the program version
and the ID for RS485 communication.
2.
Press the ON button on the AT3 panel.
The device starts operation.
3.
Check that abnormal noise is not generated
and the suction is appropriate.
4.
Set a desired suction power level by
pressing the Left/Right arrow buttons.
The suction power is indicated by the
suction power level lamps (1 to 7).
IMPORTANT
• Ensure appropriate piping during operation.
The piping should be as short as practicable, with the piping port diameter not too
small.
IMPORTANT
• Leave an interval of three minutes or more between on/off switching.Repeated
on/off switching at intervals of less than three minutes, in particular less than 30
seconds, may cause failure.
Ver*.** ID.**
Removable flange
Left/Right arrow
buttons
Suction power
level lamps
Содержание CBA-080AT3-HI
Страница 69: ...MEMO ...