Installation Instructions
WBM3E
7
Adjusting Wall Brackets for Installation
NOTE:
The wall brackets on the wall assembly may be
adjusted to suit installation needs, but must be spaced
a
minimum
of 16" apart.
1.
Slide wall brackets along wall assembly (K). (See Figure 3)
2.
Tighten button head cap screw on each wall bracket to
secure wall brackets to wall assembly. (See Figure 3)
Figure 3
NOTE:
Proceed to the
Installing to a Wood Stud Wall
section, or the
Installing to a Concrete or Concrete
Block Wall
section, as appropriate.
Installing to a Wood Stud Wall
1.
Determine the center of the chalkboard.
2.
Locate the closest 2" x 4" wood stud to the left and right of
the selected location.
NOTE:
The two WBM3E wall brackets on the wall assembly (K)
must be mounted a
minimum
of 16" apart, or a
maximum
of 42" apart.
3.
Using a level, mark the wall on each stud above existing
chalkboard through
top
mounting hole in the wall assembly
(K). (See Figure 4)
4.
Drill one 1/8” pilot hole in each stud. (See Figure 4)
5.
Use two 1/4-20 x 2-1/2” lag bolts (C) and two 1/4” flat washers
(A) to attach wall assembly (K) to wall. (See Figure 4)
6.
Mark the wall through the
lower
mounting hole in the wall
assembly (K). (See Figure 4)
7.
Drill one 1/8” pilot hole in each stud through lower mounting
hole in wall assembly (K). (See Figure 4)
8.
Use two 1/4-20 x 2-1/2” lag bolts (C) and two 1/4” flat washers
(A) to attach wall assembly (K) to wall. (See Figure 4)
Figure 4
Installing to a Concrete or Concrete Block Wall
NOTE:
The WBM3E may be attached to an 8" concrete wall or
an 8" x 8" x 16" concrete block wall.
1.
Determine the center of the chalkboard.
NOTE:
The two WBM3E wall brackets on the wall assembly (K)
must be mounted a
minimum
of 16" apart, or a
maximum
of 42" apart.
2.
Using a level, mark the wall above existing chalkboard
through top mounting hole in the wall assembly (K). (See
Figure 5)
Figure 5
2
x 2
1
(side view)
1
(K)
Wall brackets
3
4
(C) x 4
8
5
(A) x 4
(K)
6
7
2
4
(B) x 4
3
5
(C) x 4
8
9
6
7
(A) x 4
(K)