Installation Instructions
TS525TU
13
Cable Management
1.
Make all cable connections to display.
2.
Open cable management covers on upper and lower swing
arms. (See Figure 19)
3.
Route cables on top of upper arm. (See Figure 19)
4.
(Optional) Use cable ties (not included) to secure cables to
upper arms by threading ties around cable and through
cable tie holes on arms. (See Figure 19)
5.
Close upper cable management cover. (See Figure 19)
6.
Route cables under lower portion of swing arm. (See Figure
19)
7.
(Optional) Use cable ties (not included) to secure cables to
lower arms by threading ties around cable and through
cable tie holes on arms. (See Figure 19)
8.
Close lower cable management cover. (See Figure 19)
Figure 19
Creating Space (Optional)
In order to create more space between display and mount,
spacers may be added.
1.
Extend swing arms in order to gain access to the center
support.
2.
Remove flat hex-head screw holding latch to center
support. (See Figure 20)
3.
Place latch spacer (Y) behind latch and line with holes on
center support. (See Figure 20)
4.
Install #10-24 x 1 1/4" flat hex-head screw (V) through latch
and latch spacer (Y) and into holes on center support. (See
Figure 20)
Figure 20
5.
Remove 1/2" knob assembly installed on center support.
(See Figure 20)
6.
Replace 1/2" knob assembly with 1" knob assembly (U).
(See Figure 20)
Height Adjustment
1.
Extend swing arms in order to gain access to the center
support.
2.
Adjust height adjustment wrench to raise or lower mount to
desired height. Turn counter-clockwise to raise mount and
clockwise to lower mount. (See Figure 21)
Figure 21
cable management
covers
cable (typical)
2
3
8
2
cable ties
(not included)
4
(Y)
remove and replace
with (U)
3
2
4
5
6
remove and replace
with (V)
raise
lower