background image

Instruction Instructions 

NAV-1 

 

 

3

INSPECT PARTS BEFORE ASSEMBLY

Remove and Inspect the NAV-1 

1.  Open the shipping container and remove the NAV-1 

from the container. 

2.  Carefully inspect the NAV-1 for shipping damage. If 

any damage is apparent, call your carrier claims 
agent and do not continue with the assembly 
procedure until the carrier has reviewed the damage. 

NOTE:  

Read all assembly instructions before 

starting assembly. 

3.  Carefully inspect all components for damage. See 

Table 1, Figure 1, and Figure 2. 

Table 1. NAV-1 Parts 

ITEM

PART

 

NAME 

QTY

10 

MAIN PLATE

 1 

20 

FRONT ADJUSTABLE PLATE

 1 

30 

SEMS SCREW

,

 PAN

,

 SELF

-

TAPPING

,

 PHILLIPS

 4 

40 

FRONT PLATE

 1 

50 1/4-20

 X 

3/4”

 CARRIAGE BOLT 

 1 

60 

KNOB

 1 

70 

10-24

 X 

1-1/4”

 PHILLIPS HEAD MACHINE 

SCREW BZ

 

80 

10-24

 X 

5/8”

 PHILLIPS HEAD MACHINE 

SCREW BZ 

(

NOT SHOWN

90 #10

 SAE FLAT WASHER BZ

 4 

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

 

Figure 1. NAV-1 Lens Support 

Figure 2. NAV-1 Lens Support (Top View) 

20 

60 

70 

40 

30 

and 

90 

50 

10

Содержание NAV-1 Lens Support

Страница 1: ...ld affect or void the Factory warranty thoroughly study all instructions and illustrations before you begin to install the mount brackets Pay particular atten tion to the Important Warnings and Cautio...

Страница 2: ...before installing the NAV 1 on the projector WARNING Be aware of the potential for personal injury or damage to the unit if it is not adequately mounted CAUTION Inspect the unit for shipping damage CO...

Страница 3: ...ge NOTE Read all assembly instructions before starting assembly 3 Carefully inspect all components for damage See Table 1 Figure 1 and Figure 2 Table 1 NAV 1 Parts ITEM PART NAME QTY 10 MAIN PLATE 1 2...

Страница 4: ...ount as follows NOTE If your projector is not installed on the RPA ceiling mount proceed to the next procedure 1 Power off the projector 2 Disconnect the power cord that supplies electric power to the...

Страница 5: ...on the NAV 1 with the slotted holes on the RPA For reference see step 1 6 Locate the parts bag supplied with the NAV 1 Find four 5 8 screws 80 and four 10 washers 90 NOTE Leave the four screws 80 loos...

Страница 6: ...he front plate 40 down all the way and finger tighten the knob See Figure 8 Figure 8 Leave Front Plate in Down Position 3 With an assistant install your projector back on the ceiling mount at this tim...

Страница 7: ...approximately 1 8 to 1 4 from the projector lens c Tighten the four screws 30 and washers 90 Lateral Shift Adjustment 3 To adjust lateral shift do the following a Loosen the knob 60 and slide the lens...

Отзывы: