background image

4

Installation Instructions

MSP-WRTIDSKY1 Skybox Kit

ANCHORING PROCEDURES

NOTE:

  If the true ceiling is more than 36 in. (914 mm) above 

the suspended ceiling, you must obtain additional anchoring 
wire. Use 14-gauge soft galvanized wire. A longer safety cable 
may also be required. Contact Chief Manufacturing for assis-
tance in determining your specific requirements.

Anchoring Methods

Select the appropriate anchoring method for your ceiling:

NOTE:

  Four eye lag screws and four concrete anchors are 

shipped with the Kit.

Wood Joists or Beams.

  Drill four 5/32-in. dia. holes, at least 2 

in. deep (4-mm dia. holes, 51 mm deep).  Fully insert eye lag 
screws (see Figure 5).

Solid Concrete.

1. Drill four 1/4-in. dia. holes 1-3/8 in. deep (6-mm dia. holes, 

36 mm deep). Use ANSI B94.12-1977 carbide bit (see 
Figure 6).

  2. Tap anchors into hole to an embedded depth of at 

least 1” (25.4 mm deep).

  3. Using a hammer with a claw, pull anchor out 1/4” (6.36 mm) to 

activate anchor.

Truss Ceiling.

 Attach the tie wire to the turnbuckle and loop 

its upper end around the ceiling truss. Pull the tie wire tight and 
twist it around itself at least four times. No additional anchor is 
required (see Figure 7).

Anchoring Procedure

1. Cut the 20-ft (6.1 m) tie wire into four pieces of equal length.

WARNING:  Make sure the tie wire will not become loose.  
Thread the end of the wire back through the first loop, clos-
est to the eyebolt, and bend the end of the wire up to pre-
vent the wire from untwisting (see Figure 8).

2. Insert the wires through the ends of the turnbuckles. Twist each 

wire around itself at least four times, then thread the wire back 
through the loop closest to the eyebolt (see Figure 8).

3. If required (see “Anchoring Methods” above), drill holes for 

the four ceiling anchors. Position the holes so that the tie wires, 
when attached and taut, will angle outward at 15

o

 as shown. 

4. Pull the tie wires tight and attach them to the ends of the ceiling 

anchors (or to the truss) and secure as in Step 2. The weight of 
the ceiling tray should now be supported by the tie wires.

Wood Joists

or Beams

Solid Concrete

Truss Ceilings

Figure 8.  Anchoring

Figure 5.  Anchoring in Wood

Figure 6.  Anchoring in Concrete

Figure 7.  Truss Anchoring

Содержание MSP-WRTIDSKY1

Страница 1: ... Kit which could affect or void the Factory warranty and to the equipment that will be attached to it thoroughly study all instructions and illustrations before you begin the installation Pay particu lar attention to the Important Precautions on Page 1 The maximum weight to be installed on the MSP WRTIDSKY1 is 40 pounds 18 14 Kg The spanning brackets are designed to fit above a conventional suspen...

Страница 2: ... is responsible for verifying that the structure to which the MSP WRTIDSKY1 s reinforcing plate is anchored will safely support the combined load of all attached components or other equipment WARNING The weight of the LCD displays must not exceed 40 lbs 18 14 kg the maximum load capacity of the rein forcing plate CAUTION To avoid personal injury or damage to the suspended ceiling kit be sure that ...

Страница 3: ...2 Installation Instructions MSP WRTIDSKY1 Skybox Kit DIMENSIONAL DRAWING ...

Страница 4: ...ee 1 4 split lock washers 60 and three 1 4 20 hex nuts 50 Do not tighten at this time see Figure 1 2 Remove the tiles from the area where mounting the kit 3 Install the span bracket assembly between the suspended ceil ing tile rails grid and expand the span bracket assembly until the brackets are flush with the rails see Figure 2 4 Tighten three 1 4 20 hex nuts 50 to secure span bracket assembly b...

Страница 5: ...le and loop its upper end around the ceiling truss Pull the tie wire tight and twist it around itself at least four times No additional anchor is required see Figure 7 Anchoring Procedure 1 Cut the 20 ft 6 1 m tie wire into four pieces of equal length WARNING Make sure the tie wire will not become loose Thread the end of the wire back through the first loop clos est to the eyebolt and bend the end...

Страница 6: ... panel display on LCD mount brackets 20 and secure using four M4 X 10mm Phillips pan head screws 80 see Figure 9 2 With four screws securing LCD mount bracket and four screws securing display to LCD mount bracket loose position display to desired location and height 3 Tighten four screws securing LCD mount bracket and four screws securing display to LCD mount bracket H Box Not Included 1 Install H...

Страница 7: ... Carriage 1 4 20 X 5 8 3 40 WASHER Flat 1 4 3 50 NUT hex 1 4 20 3 60 WASHER lock split 1 4 3 70 SCREW button head 10 32 X 3 8 16 80 SCREW Panhead M4 7 X 10mm 8 90 WIRE 14 gage 20 ft 6 1 m 1 100 ANCHOR concrete 4 110 SCREW lag eye 4 120 TURNBUCKLE 1 4 20 with hook and loop 4 130 KEY hex 1 8 1 10 20 30 40 50 60 70 80 90 100 110 120 130 ...

Отзывы: